Back

How to Review Master Activity Matches?

Check the AI mapping and mark rows as reviewed

Create your first baseline 3 steps Updated October 1, 2026

Guide 16 of 36 in Baseline creating
  1. Read the mapping columns

    After predicting the master activity, each BOQ item shows its Master Activity Name, Division Name, the Matched BOQ Description from the Planning Bank, the Mapping Confidence and the Mapping Method.

  2. Check the confidence

    The confidence bar shows how sure the software is about the match. Check low-confidence rows first. The method shows how the match was made (for example similarity, exact or manual).

  3. Mark the row as reviewed

    When you are happy with a row, tick its box in the ✓ column. The REVIEWED bar in the toolbar shows your progress.

    Note: Rows you have ticked are not changed when you run the master activity prediction again.

← Back to all How-To guides

×