    • Week 1 Primavera Sample Project for Discussion -Construction Works At Camp

    Week 1 Primavera Sample Project for Discussion -Construction Works At Camp

    • Posted by Hany Ismail, MSC, PMP
    • Categories Uncategorized
    • Date September 17, 2013
    • Comments 28 comments

    Project description: the project scope is consists of 4 facilities, facility no. 0 which is site works and external works (telephone, street lighting and connecting L.V cables to feed the building and other facilities), facility no. 1 which is dinning hall, facility no. 3 which is Artificial Grass football playground and facility no. 4 which is multipurpose sports field (rubber flooring playground) and finally test and commissioning of all the project.


    This is an open discussion about the attached primavera schedule, This schedule submitted from our site member and we need to help improving the quality of the time schedules as we discuss the mistakes and the ways to make such schedule looks better.

    Download the schedule from the following link:

    Download primavera files

    [download#5]

    wk1-project

     


    I will add one comment and leave other comments for you

    My comment: There are no procurement and delivery section for materials, This is very important section and should be well defined.

    Now your turn, what are your comments ?

    If you want to share your sample project schedule for discussion, send it to me as per the following:

    1- Project Name and good description to allow us to understand your project to comment on it.

    2- Project XER File

    3- Project PDF File

    4- Send it to [email protected]


    Tag:Primavera, Sample Project, time schedules, XER File

    • Share:
    Hany Ismail, MSC, PMP
    Hany Ismail, MSC, PMP

    Hany Ismael is the founder and CEO of Planning Engineer Est. in Egypt. He has started his career back in 2003 as a site engineer, technical office engineer, planning engineer, planning manager, and finally planning department manager where he has been involved in several mega construction projects in Egypt and Saudi Arabia. In 2016, he established his own company in Egypt โ€œPlanning Engineer Est.โ€ Hany gained his MSc degree in project management from Liverpool University-UK 2013-2016, PMP certified from PMI-USA 2010, and BSc Civil Engineer Tanta University-Egypt 2003. Hany provided more than 3,500 hours of planning and project management training on his website planningengineer.net, YouTube channel, and offline courses since 2011. He enjoys teaching project management in simple and practical way, and he developed several planning tools, techniques and courses.

    Previous post

    Open discussion about Members Primavera Time schedules โ€“Real Projects-
    September 17, 2013

    Next post

    Week 2 Primavera Discussion -constructing a house of three floor
    September 23, 2013

    You may also like

    Good Planning VS Poor Planning Pain Curves
    Pain Curve | Good Planning V.S Poor Planning
    15 December, 2021
    2021-10-04_21-42-57
    Productivity Rates for Construction Projects
    4 October, 2021
    Sponsored By-
    Planning Engineer Salary Survey 2017
    8 October, 2017

      28 Comments

    1. blank
      Ferdi Uy
      September 17, 2013
      Log in to Reply

      Hi. The rar file is corrupted. is it the xer file?

    2. blank
      Ferdi Uy
      September 17, 2013
      Log in to Reply

      There is no local authority related item to obtain electricity, telephone, civil defence, and municipality approval which is an important item in the project

    3. blank
      Ibrahim Alrabib
      September 17, 2013
      Log in to Reply

      The file is corrupted…

    4. blank
      Zeyad Marachi
      September 18, 2013
      Log in to Reply

      The rar file 12058.rar is is corrupted, unable to open it

    5. blank
      Tu Nguyen
      September 18, 2013
      Log in to Reply

      12058.rar is broken!

    6. blank
      Zeyad Marachi
      September 18, 2013
      Log in to Reply

      First we need the xer file of the project, which we couldnโ€™t download, it says its corrupt!
      Then we can put a plan to estimate how good is the schedule, we should focus on how it was built, organized, linked and how it was scheduled, then a look at resource and cost management.
      To achieve that we should have a look (if possible) at projectโ€™s documentation, then dates, duration and deadlines, WBS structure, Activities types, project calendars, measure Milestones, Find open ended relationships, find leads and lags, check constraints and out of sequence activities. Critical Path and total float, resource assignments, find resource over-allocation, check cost loading, and earned value.

    7. blank
      Muhammad Azeem
      September 18, 2013
      Log in to Reply

      The file is corrupted

    8. blank
      Ghulam Rasool Kashmiri
      September 18, 2013
      Log in to Reply

      Yeh kis ka banaya hai bhai

    9. blank
      Zeyad Marachi
      September 19, 2013
      Log in to Reply

      Thank you for your mail, I did download both files , the pdf one opens and is OK, the other 12058.rar, I'm not able to open it as its giving that its damaged, so would you please check it once again, only the pdf file is not enough to comment on the schedule, Thanks.

    10. blank
      Magdy Tolba
      September 19, 2013
      Log in to Reply

      the file 12058.rar is corrupted

    11. blank
      Saqib Paracha
      September 19, 2013
      Log in to Reply

      Call for Admin….. many people would like to add to this great exercise… but admin of this websites seems to be busy as we didn't see any response to many of the fellows comments that the XER file is corrupted. Fankely speeking good comments could not be made on the schedule viability as long as XER file is not available. We need Admin to jump in and reattach the XER file as it si corrupted.

      Further to the above my suggestion for the comments are;

      1) In order to make sequential comments or step by step comments we should choose one topic and stick to that for commenting. as long as that topic is exhausted and fully understand the problems in the schedule related to that perticular topics we will move to another area of schedule validation.

      my Openion for sequential comments are
      1) The Schedule Capture all activities or not (like the Admin commented that the Schedule is lacking with procurement activities, WBS should be product oriented, Represent activities of the Engineer and Client etc.)
      2) sequencing Activities (e.g Network should be complete, mazimise use of FS logic and minimize/no use of SF logic, Constraint, Lags/Leads, etc)
      3) resource Allocation
      4) Valid Duration
      5) Validitiy of Critical Path
      6) Reasonable Total Float etc.

    12. blank
      Planning Engineer
      September 19, 2013
      Log in to Reply

      Check now, the files should be working

    13. blank
      Planning Engineer
      September 19, 2013
      Log in to Reply

      Check now, the files should be working

    14. blank
      Planning Engineer
      September 19, 2013
      Log in to Reply

      Check now, the files should be working

    15. blank
      Planning Engineer
      September 19, 2013
      Log in to Reply

      Check now, the files should be working

    16. blank
      Planning Engineer
      September 19, 2013
      Log in to Reply

      Check now, the files should be working

    17. blank
      Planning Engineer
      September 19, 2013
      Log in to Reply

      Check now, the files should be working

    18. blank
      Planning Engineer
      September 19, 2013
      Log in to Reply

      Check now, the files should be working

    19. blank
      Saqib Paracha
      September 21, 2013
      Log in to Reply

      Planning Engineer ……… Sir, still there is a problem with the file when i have tried to import it into excell… the file is invalid…….. i dont know whats the issue…….. is there any version problem… i am using P6V7..
      please suggest

    20. blank
      Saqib Paracha
      September 22, 2013
      Log in to Reply

      Sorry not excell, but Primavera P6

    21. blank
      Saqib Paracha
      September 22, 2013
      Log in to Reply

      Dear Planning Engineer…… Week 1 is near to finish and we are just could not escape the problem of XER file…. ๐Ÿ™ we are getting very slow response form your side… please help improve the system

    22. blank
      Waleed Moustafa
      September 23, 2013
      Log in to Reply

      Dear all, sorry for late to reply, I sent the file again to the admin, hope it will work, I will be happy to see your comments

    23. blank
      Planning Engineer
      September 25, 2013
      Log in to Reply

      Comment came by Email

      1/ It is true โ€“ between concrete slab and plasters there is enough time โ€“ around 3 weeks, but to me the activities as concrete curing, mounting/dismantlement of scaffolding and shuttering should present โ€“ they could become critical!
      In addition with this level of detailization of the resources, missed activities resources as curing compound, sets of scaffolding or shuttering etc. will remind hidden and easily missed!

      2/ The same for production and supply activities โ€“ they are missing, if kitchen cabinets subcontractor delays the production or supply, how planner will prove who is responsible for the delay of mounting of kitchen cabinets?

    24. blank
      Mahmoud Saleh
      October 9, 2013
      Log in to Reply

      ูŠุงุฃุฎูŠ ุงูุชูƒุฑู†ูŠ ูˆุนุจุฑู†ูŠ ู‡ูˆ ู…ุงูƒู†ุด ุนูŠุด ูˆุจุฑูˆุณุช ูˆู„ุง ุงูŠู‡

    25. blank
      Mahmoud Saleh
      October 9, 2013
      Log in to Reply

      ูŠุงุฃุฎูŠ ุงูุชูƒุฑู†ูŠ ูˆุนุจุฑู†ูŠ ู‡ูˆ ู…ุงูƒู†ุด ุนูŠุด ูˆุจุฑูˆุณุช ูˆู„ุง ุงูŠู‡

    26. blank
      Magdy Tolba
      October 9, 2013
      Log in to Reply

      Mahmoud Saleh ู‡ู‡ู‡ู‡ู‡ู‡ู‡ู‡ู‡ู‡ู‡ู‡ … ุฃู‡ู„ุข ุจุฃุฎู‰ ุงู„ุนุฒูŠุฒ ู…ู‡ู†ุฏุณ ู…ุญู…ูˆุฏ … ุฃุฎุจุงุฑูƒ ุฅูŠู‡ ..ูˆุฃุณุฑุชูƒ ุงู„ูƒุฑูŠู…ู‡ ู„ุนู„ูƒู… ุจุฎูŠุฑ
      ุฅุจู‚ู‰ ุฅุชุตู„ ูŠุง ุฑูŠุณ ุนู„ุดุงู† ู†ุนุฑู ุฃุฎุจุงุฑูƒ ูˆู†ุทู…ู† ุนู„ูŠูƒ … (ุชู„ูŠููˆู†ู‰ 00201003070328 ) ..

    27. blank
      Mahmoud Saleh
      October 12, 2013
      Log in to Reply

      ูƒู„ ุณู†ู‡ ูˆุงู†ุช ุทูŠุจ ูŠุงุญุจูŠุจ ู‚ู„ุจูŠ ูˆุจุนุฏุฉ ุงู„ุฃูŠุงู… ูˆูŠุฌุนู„ูˆุง ุฑุจู†ุง ุนูŠุฏ ุณุนูŠุฏ ุนู„ูŠู†ุง ูˆุนู„ูŠูƒู…

    28. blank
      selvan
      April 16, 2015
      Log in to Reply

      hi im new to planning department and im very much nee in learning P6

      can i get sample any residential project for practising in p6 and how to input all activities i.e procedure for inputting task and get the results.

    Leave A Reply Cancel reply

    You must be logged in to post a comment.

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ยฉ2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....