Construction Project Management Fundamentals Course
Learn how real construction projects are planned, managed, and controlled — from initiation to closing —
using practical methods that help you deliver on time, within scope, and on budget.
- Best for: fresh engineers, site engineers, planners, and career switchers
- No prior project management experience required
- Certificate upon completion (smart certificate with verification code)
Instructor: Hany Ismail — Planning Director & Trainer
Course Overview
The Construction Project Management Fundamentals Course gives you essential skills to manage
construction projects from start to finish — with practical tools and best practices to deliver
on time, within scope, and within budget.
Who This Course Is For
- Aspiring project managers and construction engineers
- Site engineers moving into planning or project management roles
- Planning engineers who want a solid project management foundation
- Construction professionals seeking a clear introduction to FIDIC and claims
This course is NOT ideal if:
- You already manage advanced planning or claims on mega projects
- You are looking for an advanced Primavera P6-only course
Key Topics Covered
- Introduction to Project Management — roles, responsibilities, and project phases
- Project Initiation — objectives, stakeholders, and the project charter
- Project Planning — schedule, resources, cost, risk, and communication (Primavera P6)
- Project Execution — managing teams, progress tracking, and quality control
- Monitoring & Controlling — performance measurement and change management
- FIDIC and Claims Management — contracts, claims, and contractor entitlements
- Project Closing — handover, lessons learned, and contract closure
Why Enroll?
- Hands-on learning with real construction examples
- Full lifecycle coverage from initiation to closing
- Practical exposure to FIDIC contracts and claims basics
- Free enrollment with certificate upon completion
- PMP-aligned fundamentals based on PMBOK Guide
- Supportive learning environment with expert guidance
About the Instructor
Hany Ismail — Planning Director & Trainer.
This course provides practical construction project management fundamentals that prepare you
for advanced planning roles, PMP certification, and long-term career growth.
What You’ll Get
- High-quality video lessons
- Downloadable templates and resources
- Expert support through course forums
- A smart certificate with a verification code
⭐⭐⭐⭐⭐ Rated 5.0 by 96+ engineers | 6,546 students already enrolled
Join Now
Enroll for free and start learning at your own pace.
Note: If you don’t have an account on the website, your account will be created automatically during checkout.
FAQ
Is this course really free?
Yes — the product price is $0, so you can enroll through checkout and start immediately.
Do I need prior experience?
No. It’s designed for beginners and engineers transitioning into planning / PM roles.
Do I get a certificate?
Yes — you receive a smart certificate with a verification code after completion.
What language is it?
English with Arabic subtitles.
كيفية الاشتراك فى الكورس و تفعيل الترجمة باللغة العربية |
Course Features
- Lectures 36
- Quiz 0
- Duration 17.5 Hours
- Skill level All levels
- Language English with Arabic Subtitles
- Students 8016
- Certificate Yes
- Assessments Yes
Curriculum
- 7 Sections
- 36 Lessons
- Lifetime
- 01 | Introduction1 Item
- 02 | Project Initiation Phase4 Items
- 2.102 | Project Management Initiation Phase & Feasibility Study | Construction Management Course11 Minutes
- 2.203 | Understanding Different Types of Contracts | Construction Project Management10 Minutes
- 2.304 | Key Project Management Terms for the Initiation Phase | Construction Management16 Minutes
- 2.405 | Introduction to Earned Value Management (EVM) | Construction Project Management13 Minutes
- 03 | Planning Phase16 Items
- 3.106 | Key Outputs of the Planning Phase | Construction Project Management8 Minutes
- 3.207 | How to Read a Primavera P6 Time Schedule | Project Management Fundamentals13 Minutes
- 3.308 | How to Download and Install Primavera P6 | Step-by-Step Guide6 Minutes
- 3.409 | How to Create a Project and Work Breakdown Structure (WBS) in Primavera P613 Minutes
- 3.510 | How to Add Activities and Relationships in Primavera P618 Minutes
- 3.611 | How to Share and Import a Schedule in Primavera P612 Minutes
- 3.712 | How to Create and Assign a Baseline in Primavera P67 Minutes
- 3.813 | How to Use Filters and Earned Value Management (EVM) in Primavera P612 Minutes
- 3.914 | How to Do Cost Loading in Primavera P68 Minutes
- 3.1015 | How to Do Resource Loading in Primavera P69 Minutes
- 3.1116 | Understanding Cash Flow and S-Curve in Primavera P69 Minutes
- 3.1217 | Understanding Manpower and Equipment Histograms in Primavera P66 Minutes
- 3.1318 | Managing Shop Drawing and Procurement Logs in Construction Projects11 Minutes
- 3.1419 | Understanding Project Management Plan in Construction Projects According to PMI15 Minutes
- 3.1520 | Planning Best Practices in Construction Projects17 Minutes
- 3.1621 | Finding Delayed Activities & Creating Lookahead Schedules in Primavera P6:10 Minutes
- 04 | Execution & Control Phase12 Items
- 4.122 | Earned Value Management & Execution Phase Monitoring in Primavera P612 Minutes
- 4.223 | Dashboards vs. Reports in Project Management9 Minutes
- 4.324 | Essential Excel Tips and Tricks for Engineers8 Minutes
- 4.425 | Creating a Progress Dashboard in Excel22 Minutes
- 4.526 | Understanding Cost Control in Construction Projects14 Minutes
- 4.627 | Understanding Risk Management in Construction Projects16 Minutes
- 4.728 | Communication and Conflict Management in Construction Projects10 Minutes
- 4.829 | Team Development, XY Theory, and Maslow’s Hierarchy in Construction Projects11 Minutes
- 4.930 | Recovery Schedule: Crashing, Fast-Tracking, and Practical Application in Construction Projects12 Minutes
- 4.1031 | Revised Schedule: Delay Events, Extensions, and Practical Analysis10 Minutes
- 4.1132 | Claim Management: Types, Techniques, and How to Create Strong EOT Claims23 Minutes
- 4.1233 | Understanding FIDIC and Its Role in Construction Claims10 Minutes
- 05 | Project Closing Phase1 Item
- 06 | Certificate & Next Steps1 Item
- 07 | Share Your Certificate on LinkedIn1 Item
Questions & answers
Answers from our team to questions students ask in the course support group.
Planning Phase
QDo you plan procurement for every floor or work package in the programme, or only long-lead items?
Procurement is planned per material, not per location. For example, if the same tiles go on every floor, add one procurement activity for that item. Long-lead materials are often kept apart from the others in the WBS.
QHow do you handle standard and repetitive materials, for example with a procurement log or a rolling look-ahead?
The same way as above: one procurement activity per material, not one per floor or area.
QHow do you set order-by dates, and do you link them to installation activities?
The procurement in the main schedule is kept at a high level. The detail goes in a separate document, the procurement tracking schedule. More reading:
Certificate & Next Steps
QHow do I get my certificate after finishing the course?
Complete the lessons until you reach the passing grade of 80%. Then open this course page and click the Certificate button at the top to view and download your certificate.
Every certificate has a unique QR code. Anyone (for example an employer) can scan it to confirm the certificate on our website.
No questions match your search.




