Back
Sale!

Planning Engineer All-in-One Roadmap Package

Original price was: $1,300.Current price is: $999.

All courses. One program. One career path — from fundamentals to advanced planning and project controls.

  • 8 courses + 5 bonus courses
  • 8 course certificates + the Planning and Project Controls Master Certificate
  • Lifetime access · WhatsApp support groups

Your account is created automatically at checkout.

-
+
Category:

Get structured access to every Planning Engineer course in one learning path: project management fundamentals, Primavera P6, intermediate and advanced planning, claims, data management and reporting, Power BI dashboards and cost control — with practical tools, templates and real case studies.

8Courses
+5Bonus courses
340+ hoursDuration
LifetimeAccess
CertificatesWith QR verification

Courses included

  1. 01
    Construction Project Management Fundamentals Course

    Learn how real construction projects are planned, managed, and controlled — from initiation to closing.

    36 lessons · 17.5 Hours · English with Arabic Subtitles
  2. 02
    Primavera Online Basic Course -English

    Learn to plan, schedule, monitor and control construction projects with Oracle Primavera P6 — through practical, real-world application, not theory.

    38 lessons · 35 hours · English
  3. 03
    Construction Project Planning Intermediate Level with P6

    Take your planning skills to the next level — build smarter schedules, load costs and resources, and control progress with Primavera P6 and Excel on a real project.

    19 lessons · 50 Hours
  4. 04
    Professional Planning Engineer (PPE)

    Become a confident, high-performing planning engineer — plan, schedule, monitor, control and report a real mega-project using Primavera P6, Excel and Power BI.

    38 lessons · 50 hours · English
  5. 05
    Claims Management and (EOT)

    Learn to prepare, justify and present professional construction claims and Extension of Time (EOT) submissions — with practical delay analysis on a real project.

    19 lessons · 36 hours · English
  6. 06
    Data Management and Reporting

    Turn raw project data into clear, professional planning reports and dashboards — with practical Excel database techniques and data from Primavera P6.

    20 lessons · 20 Hours
  7. 07
    Power Bi Monitoring and Controlling with P6

    Turn your Primavera P6 schedule into interactive Power BI dashboards that monitor progress and control cost, man-hours and delays — no prior Power BI experience needed.

    37 lessons · 30 Hours · English
  8. 08
    Cost Control for Construction Projects

    Build a complete cost control system for construction projects using Excel and its data model — no expensive software needed.

    39 lessons · 30 Hours · English

Bonus courses

Earn the Master Certificate

Sample Planning and Project Controls Master Certificate

Complete the 8 main courses and you receive the Planning and Project Controls Master Certificate automatically. It is a special certificate that lists every course you completed, so employers see the full program behind it.

  • Issued automatically when you pass your 8th course
  • Verifiable online with its QR code
  • Ready to add to your CV and LinkedIn profile

Who this package is for

  • Any engineer who wants to become a professional planning engineer — from zero to hero
  • Site engineers moving into planning or project controls
  • Planning engineers who want the complete toolkit in one package

Certificates

  • 8 course certificates + the Planning and Project Controls Master Certificate
  • Each certificate can be verified with its QR code

What you get

Lifetime accessEvery lesson of every course in the package, anytime.
Course files and toolsAll lesson files, Excel tools and templates.
WhatsApp support groupsEach main course has its own WhatsApp support group with our team.
Articles librariesPractical articles, files and ready-to-use templates for each course.
Course Q&AAnswers to common student questions, curated by our team.
Certificates8 course certificates + the Planning and Project Controls Master Certificate.

FAQ

What is the price?
Prices are in US dollars and vary from one country to another. The price shown on this page is the price for your country.
How much do I save?
The package costs much less than buying the courses one by one, and it includes the bonus courses for free.
How do I start after checkout?
You are enrolled in every course of the package automatically. Open any course from your profile and start learning in the order shown above, or jump to the course you need first.
Do I need an account?
No. If you don’t have an account, it is created automatically during checkout.
Enroll now

Your account is created automatically at checkout.

×