    Glass Blockwork Method Statement

    • Posted by Hany Ismail, MSC, PMP
    • Categories Management Template
    • Date March 5, 2014
    • Comments 0 comment

    Preparation of Work, Materials and Components:

    i) When the materials and components are distributed to the work area, ensure that the structure is not overloaded.

    ii) Plan for scaffolding material required for work at heights. Plan for additional manpower for lifting blocks at heights.

    iii) Set out anticipating the position of openings etc. in the work above to avoid adjustment of units leading to incorrect or uneven bonding.

    Preparation of Mortar Mixes:

    i) Mortar shall be mixed by machine except for small quantities only. Hand mixing (if permitted) may be done on a watertight platform.

    ii) When mixed at site, batch boxes shall be used to ensure correct and consistent mix proportions.

    iii) Use mortars (other than retarded mortars) within 2 hours of mixing or as specified.

    Building walls:

    i) Build work within permissible deviations as specified.

    ii) Unless otherwise specified/permitted, lay blocks on a full bed of mortar and fill all joints. Place reinforcement as detailed in position, use spaces as necessary to keep courses levelled and perpend vertically aligned. Plumb quoins and all faces as the work proceeds. It is preferable to align vertically every fifth or sixth perpend and `even out’ the size of intermediate joints. Try to keep horizontal joints of uniform thickness.

    iii) Do not carry one course more than the height specified in the contract specifications.

    iv) Where pointing is specified rake out joints as work proceeds. The mortar used for the pointing should be mixed as detailed in the specification.

    v) All work shall be bonded to adjacent structures by means of stainless steel cramps at specified spacing unless specified otherwise.

    vi) All glass blocks must be cleaned down as work proceeds.

     

     

    Download Glass Blockwork Method Statement in word format:CONTROL OF GLASS BLOCKWORK

    Tag:blockwork method, Glass Block work, Glass Blockwork, joints, method statement, mortar, work, work proceeds

    • Share:
    Hany Ismail, MSC, PMP
    Hany Ismail, MSC, PMP

    Hany Ismael is the founder and CEO of Planning Engineer Est. in Egypt. He has started his career back in 2003 as a site engineer, technical office engineer, planning engineer, planning manager, and finally planning department manager where he has been involved in several mega construction projects in Egypt and Saudi Arabia. In 2016, he established his own company in Egypt “Planning Engineer Est.” Hany gained his MSc degree in project management from Liverpool University-UK 2013-2016, PMP certified from PMI-USA 2010, and BSc Civil Engineer Tanta University-Egypt 2003. Hany provided more than 3,500 hours of planning and project management training on his website planningengineer.net, YouTube channel, and offline courses since 2011. He enjoys teaching project management in simple and practical way, and he developed several planning tools, techniques and courses.

    Previous post

    Deliverables Progress and Performance Reporting (DPPR)
    March 5, 2014

    Next post

    Underground Sewerage and Surface Water Drainage Method Statement
    March 9, 2014

    You may also like

    2022-06-19_11-56-47
    Sample Weekly and Monthly Reports
    20 June, 2022
    Power Bi
    Power BI is the next level of data analytics and visualization
    20 February, 2019
    MEP-Engineer-Job-Description
    MEP Engineer Job Description template
    24 November, 2018

    Leave A Reply Cancel reply

    You must be logged in to post a comment.

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....