Preparation of Work, Materials and Components: i) When the materials and components are distributed to the work area, ensure that the structure is not overloaded. ii) Plan for scaffolding material required for work at heights. Plan for additional manpower for …
1. SCOPE This procedure provides a method of control for construction of block masonry work in order to achieve compliance with the contract specifications and drawings. 2. PROCEDURE .1 All precast concrete masonry blockwork will be carried out in accordance with the specification …