• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    Planning Discussions

    • Home
    • Blog
    • Planning Discussions
    • Construction Projects Planning Q&A 08-Jan-2022

    Construction Projects Planning Q&A 08-Jan-2022

    • Posted by Hany Ismail, MSC, PMP
    • Categories Planning Discussions
    • Date January 8, 2022
    • Comments 0 comment

    Live Construction Planning Discussion where we discussed the following topics:

    1-  how to make good resources of contemporary records?

    2-  Should activity must have both predecessors and successors? I considered a minimum of one link relationship with each activity.

    3- Why boss is asking that both the predecessor and successor be required?

    4- Nowadays what is the role of Power BI in project control?

    5- how to save contemporary records for EOT?

    6-My project critical path has been static fr 6months, what could be the cause of this?

    7- What is the most suitable delay analysis technique to use?

    8- Now a day BIM is used for project management. What’s your opinion?

    9- I was a scheduler engineer and now I am working as a Project Management Officer, do you think is a good choice?

    10- Is there any opportunity in Saudi Arabia for a Civil Engineer Experienced man to move on to Planning Department as a fresher?

    11- How can one track the activity tasks and cashflows reflective of the actual works on-site? Can the MS Project update automatically the current status of the project completion?

    12- what software is good for planning for a manufacturing shop floor?

    13- Can u help with a standard definition for what a delay is in the construction industry?

    14- How to find the risk in construction. And our project is progressing slowly. Under budget not working

    15- Which is the best tool to analyze the construction delay

    16- Hello Hany, I like Primavera P6 as it is more powerful than MS by having its own database, but it is really annoying that it is not able to have macros and back-end development apps to be loaded into P6. VBA option in MS allows users to “change” programs per their own needs. Is Oracle going to allow something similar in the future?

    17- What is the accepted % required of critical path activities in a schedule

    18-please tell me the oil & gas ( piping)planning procedure

    19- I am a site engineer and I want to shift my career to planning, what advice would you give to me?

    Keep in Touch:

    Twitter: https://twitter.com/PlanningEEst
    YouTube: https://www.youtube.com/c/PlanningengineerNet/
    Linked in: https://www.linkedin.com/company/planning-engineer-est/
    Instagram: https://www.instagram.com/planningengineerest/
    FaceBook: https://www.facebook.com/PlanningEngineerDotNet
    WhatsApp: +201277767728
    Email: [email protected]

    Tag:accepted % required of critical path, analyze the construction delay, BIM is used for project management, critical path static, good resources, predecessors and successors, records for EOT, risk in construction, role of Power BI in project control, suitable delay analysis technique, track the activity tasks and cashflows

    • Share:
    Hany Ismail, MSC, PMP
    Hany Ismail, MSC, PMP

    Hany Ismael is the founder and CEO of Planning Engineer Est. in Egypt. He has started his career back in 2003 as a site engineer, technical office engineer, planning engineer, planning manager, and finally planning department manager where he has been involved in several mega construction projects in Egypt and Saudi Arabia. In 2016, he established his own company in Egypt “Planning Engineer Est.” Hany gained his MSc degree in project management from Liverpool University-UK 2013-2016, PMP certified from PMI-USA 2010, and BSc Civil Engineer Tanta University-Egypt 2003. Hany provided more than 3,500 hours of planning and project management training on his website planningengineer.net, YouTube channel, and offline courses since 2011. He enjoys teaching project management in simple and practical way, and he developed several planning tools, techniques and courses.

    Previous post

    Planning Engineer Interview Challenge - Pass or Fail!
    January 8, 2022

    Next post

    Bulk Delete Relationships in P6
    January 20, 2022

    You may also like

    How to become a planning engineer
    How to be prepared to work as a junior planning engineer?
    22 May, 2022
    Hany Live 15-Mar-2022
    Construction Projects Planning Q&A 15-March-2022
    15 March, 2022
    WIN_20220123_10_18_27_Pro
    Construction Projects Planning Q&A 23-Jan-2022
    23 January, 2022

    Leave A Reply Cancel reply

    You must be logged in to post a comment.

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....