Have you ever used Microsoft Excel Power Query in your daily planning tasks, such as data loading and Cost Loading sheets? If the answer is yes, in this article I want to give you some tips and tricks about the …
A baseline schedule narrative report is a document that outlines the details behind a project’s baseline schedule. The baseline schedule narrative report serves as a roadmap for the project, outlining the sequence of activities, their durations, and milestones. Here’s what …
One of our students in the PPE Course (Professional Planning Engineer) asked about Excel macros. In the PPE Course, we teach planning engineers how to automate most of their work by using Excel macros In Construction Planning. This article will …
In the primavera schedule dangling relationships refer to logical connections or dependencies between activities that are not properly defined or resolved. These relationships are considered “dangling” because they lack a clear relationship to other activities in the project schedule, potentially …
Negative float is an annoying problem in any, I will tell you how to fix the decimals negative total float in a primavera schedule by applying these simple steps. Example of avoiding negative float using control milestones: Our Case …
Introduction: This Method Statement covers the installation of AIR HANDLING UNITS (AHUs) and the requirements of checks to be carried out. Air handling units: Air Handling Units be installed in serving corridors and supplying treated fresh air to the lobbies …
Introduction: This method statement covers the site installation of the cable tray & ladders and the requirements of checks to be carried out. Cable trays and ladders: The Cable Tray system is installed in electrical rooms, plant rooms, and service …
Introduction: This method statement covers the site installation of the PVC Conduits in the floor slab & concrete walls. This procedure defines the method used to ensure that all conduits and associated accessories: bends, tees, couplers, reducers, and all accessories …
Introduction: In construction, there are three main departments which are MEP (Mechanical, Electrical, and Plumbing), Finishes, and Civil Engineering. Although they seem different, they work together closely to make big things happen. Civil engineers are responsible for designing the structural …
Introduction: This Method Statement covers the installation of HVAC Ductwork and accessories and the requirement of checks to be carried out. HVAC Ductwork: HVAC Ductwork generally includes all types of Supply Air Ducts, Return Air Ducts, Fresh and Exhaust Air …