    Planning Using Primavera

    • Home
    • Blog
    • Planning Using Primavera
    • How to create Early curve and Late curve from Primavera P6

    How to create Early curve and Late curve from Primavera P6

    • Posted by Hany Ismail, MSC, PMP
    • Categories Planning Using Primavera
    • Date November 26, 2019
    • Comments 5 comments

    Early curve and late curve are important outputs from Oracle Primavera P6. I have received the following question from my course trainee:

    “Continuation to our discussion and current subjected query can you please advise how to prepare Early curve and Late curve of any Project Schedule.”

    The answer is simple and straight forward as per the following steps:

    1- Go to Resource Assignment in P6.

    2-  Right click on the table and select spreadsheet fields then customize (see photo below) .

    3- Select Early remaining unit and then copy the data to excel.

    4- Select Late remaining unit and then copy the data to excel.

    5- Now you can make a nice comparison between Early curve and Late curve by creating the cumulative value of both.

     

    Picture how to change the units in the activity resource assignment area:

    blank

    Tag:Early curve, Late curve, primavera p6

    • Share:
    Hany Ismail, MSC, PMP
    Hany Ismail, MSC, PMP

    Hany Ismael is the founder and CEO of Planning Engineer Est. in Egypt. He has started his career back in 2003 as a site engineer, technical office engineer, planning engineer, planning manager, and finally planning department manager where he has been involved in several mega construction projects in Egypt and Saudi Arabia. In 2016, he established his own company in Egypt “Planning Engineer Est.” Hany gained his MSc degree in project management from Liverpool University-UK 2013-2016, PMP certified from PMI-USA 2010, and BSc Civil Engineer Tanta University-Egypt 2003. Hany provided more than 3,500 hours of planning and project management training on his website planningengineer.net, YouTube channel, and offline courses since 2011. He enjoys teaching project management in simple and practical way, and he developed several planning tools, techniques and courses.

    Previous post

    Split Primavera P6 Schedule into 2 Schedules - Problem and solution
    November 26, 2019

    Next post

    How to change Your Career to a Planning Engineer
    December 10, 2019

    You may also like

    Remove Actuals using Global Change cover
    Remove Primavera P6 Actuals using Global Change
    24 January, 2022
    Bulk Delete Relationships in P6 cover
    Bulk Delete Relationships in P6
    20 January, 2022
    img_0237.png
    Primavera P6 Calendar 10 Tips and Tricks
    18 November, 2020

      5 Comments

    1. blank
      Moustafa Galal
      November 26, 2019
      Log in to Reply

      it is also called Banana Curve

      • Hany Ismail, MSC, PMP
        Hany Ismail, MSC, PMP
        November 27, 2019
        Log in to Reply

        Thanks for the comment Engineer Moustafa.

    2. blank
      Mahmoud Shaker
      December 3, 2019
      Log in to Reply

      Hello Eng /Hany
      i follow ur lectures from the first step by step and thanking u for ur giving but i have aproblem to fill all cells manually so i ask u if u can send me the link to get this sheets iwill be thankfull to u

      • Hany Ismail, MSC, PMP
        Hany Ismail, MSC, PMP
        December 4, 2019
        Log in to Reply

        Dear Engineer Mahmoud,
        What do you mean by fill all cells manually?

    Leave A Reply Cancel reply

    You must be logged in to post a comment.

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....