    Management Template

    • Home
    • Blog
    • Management Template
    • PROJECT CLOSE-OUT Template

    PROJECT CLOSE-OUT Template

    • Posted by Hany Ismail, MSC, PMP
    • Categories Management Template, Project Management
    • Date February 3, 2014
    • Comments 0 comment

    PROJECT CLOSE-OUT Template in word format with description what is required in each field to fill

     

    Project Title:

    Date Prepared:

    Project Manager:

     

    Project Description:

    Provide a summary-level description of the project. This information can be copied from the Project Charter.

     

     

    Project Objectives

    Success Criteria

    How Met

    Variance

     

    Scope:
    A statement that describes the scope needed to achieve the planned benefits of the project The specific and measurable criteria that will determine project success Provide evidence that the success criteria were met. Explain any scope variances.

     

    Time:
    A statement that describes the goals for the timely completion of the project. The specific dates that must be met to determine schedule success. Identify the date of final delivery. Use the information from the Product Acceptance form. Explain any schedule or duration variances.

     

    Cost:
    A statement that describes the goals for the project expenditures. The specific currency or range of currency that defines budgetary success. Enter final project costs. Explain any cost variances.

     

    Quality:
    A statement that describes the quality criteria for the project. The specific measurements that must be met for the project and product to be considered a success. Enter the verification and validation information from the Product Acceptance form. Explain any quality variances.

     

    Other:
    Any other types of objectives appropriate to the projects. Relevant specific measurable results that define success. Enter the evidence that other objectives have been met. Explain any other variances.

     

     

    Contract Information:

    Provide information on contracts. Enter information from the Contract Close-out report.

     

     

     

     


     

     

    Approvals:

    Project Manager Signature Sponsor or Originator Signature
    Project Manager Name Sponsor or Originator Name
    Date Date

     

    Download PROJECT CLOSE-OUT Template PROJECT CLOSE-OUT Template

    Tag:CLOSE-OUT, CLOSE-OUT Template, closure template, nbsp nbsp, nbsp project, product acceptance, project close, project manager, success enter, variances nbsp

    • Share:
    Hany Ismail, MSC, PMP
    Hany Ismail, MSC, PMP

    Hany Ismael is the founder and CEO of Planning Engineer Est. in Egypt. He has started his career back in 2003 as a site engineer, technical office engineer, planning engineer, planning manager, and finally planning department manager where he has been involved in several mega construction projects in Egypt and Saudi Arabia. In 2016, he established his own company in Egypt “Planning Engineer Est.” Hany gained his MSc degree in project management from Liverpool University-UK 2013-2016, PMP certified from PMI-USA 2010, and BSc Civil Engineer Tanta University-Egypt 2003. Hany provided more than 3,500 hours of planning and project management training on his website planningengineer.net, YouTube channel, and offline courses since 2011. He enjoys teaching project management in simple and practical way, and he developed several planning tools, techniques and courses.

    Previous post

    Project Risk Terms and Definitions
    February 3, 2014

    Next post

    Team work
    February 4, 2014

    You may also like

    2022-06-28_13-53-15
    Variation Orders and EOT
    29 June, 2022
    2022-06-19_11-56-47
    Sample Weekly and Monthly Reports
    20 June, 2022
    img_0142.jpg
    How to perform Cost Control in Construction Projects
    29 September, 2020

    Leave A Reply Cancel reply

    You must be logged in to post a comment.

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....