    Planning Discussions

    • Home
    • Blog
    • Planning Discussions
    • Optimizing funds needed for each phase of a project

    Optimizing funds needed for each phase of a project

    • Posted by Hany Ismail, MSC, PMP
    • Categories Planning Discussions
    • Date April 23, 2014
    • Comments 0 comment

    Optimization is the procurer used to make a system design as very effective as possible to make maximum use of the available resource to obtain maximum results from them. It is a very important tool in saving the project resources, especially the funds for the project which are very scarce. It makes sure that the highest results are obtained at the end of the project phases.

    A good project always seeks to moderately high, long term capital appreciation with lower current income. That budget made before the financial year start, it must be able to make maximum use of the available funds, throughout the project phase. The funds for the project must be allocated well; every coin must be accounted for.

    Optimization of funds ensures maximum profit is obtained, it’s because it makes sure that the input expenses are at the lowest lowering the cost. The project can be seen if it is making a loss or a profit through assessment of financial records after every project phase. By doing this the management can be able to roughly predict the expected output at the end of the year and predict if the project will make a profit or loss.

    Furthermore, optimization is a very accurate method to employ if one wants to make a profit. By using mathematics skills, proposals can make and evaluated to identify which combination does best. The funds for the project are used to estimate the amount of output that will be obtained at the end of the project last phase. This accuracy only depends on the best formulation made by the managing c

    ommittee.

    Those using this method must be very accurate to avoid loses as a result of poor calculation. As much as the project needs to use very little funds this must be taken into consideration. The more one invests, the more output he or she gets. Other factors like proper management should remain constant so that they do not inhibit the process of investment like embezzlement, laziness and others.

    The optimization plan must always be reviewed more often; any changes in the market must be made in the plan. This plan must be in the budget for easy access. The management must always refer to it in case they need to make any decision or alter any adjustments in the project. By doing this the project will fulfill its intended goals at the end of the project final phase. It is hard to keep the budget in the mind. The use of professionals is good to determine the budget range. The project needs to plan by the professionals. You can find the professionals to deal the project plans and issues in a good way. The project management is a basic tool and category for the companies and firms. The companies always offer and show the best performance to deal with company problems. The use of project management is possible with the help of professionals.

    Tag:funds for the project, project phase

    • Share:
    Hany Ismail, MSC, PMP
    Hany Ismail, MSC, PMP

    Hany Ismael is the founder and CEO of Planning Engineer Est. in Egypt. He has started his career back in 2003 as a site engineer, technical office engineer, planning engineer, planning manager, and finally planning department manager where he has been involved in several mega construction projects in Egypt and Saudi Arabia. In 2016, he established his own company in Egypt “Planning Engineer Est.” Hany gained his MSc degree in project management from Liverpool University-UK 2013-2016, PMP certified from PMI-USA 2010, and BSc Civil Engineer Tanta University-Egypt 2003. Hany provided more than 3,500 hours of planning and project management training on his website planningengineer.net, YouTube channel, and offline courses since 2011. He enjoys teaching project management in simple and practical way, and he developed several planning tools, techniques and courses.

    Previous post

    Sampling and investigating your project site
    April 23, 2014

    Next post

    Having a budget that ensures profitability budget profit
    April 24, 2014

    You may also like

    How to become a planning engineer
    How to be prepared to work as a junior planning engineer?
    22 May, 2022
    Hany Live 15-Mar-2022
    Construction Projects Planning Q&A 15-March-2022
    15 March, 2022
    WIN_20220123_10_18_27_Pro
    Construction Projects Planning Q&A 23-Jan-2022
    23 January, 2022

    Leave A Reply Cancel reply

    You must be logged in to post a comment.

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....