• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    Planning Using Primavera

    • Home
    • Blog
    • Planning Using Primavera
    • How to read primavera time schedule for Engineers and Project Managers

    How to read primavera time schedule for Engineers and Project Managers

    • Posted by Hany Ismail, MSC, PMP
    • Categories Planning Using Primavera
    • Date April 20, 2014
    • Comments 0 comment

    This video is for Site Engineers, Construction Managers, and Project Managers to read and understand a time schedule made by Oracle Primavera.

    What is the time schedule?

    The time schedule is a contractual document between the client and the contractor which defines the forecast sequence, progress of work and the contractual start, finish and milestones dates.

    How to read and understand Primavera Time Schedule

    Primavera Time Schedule Layout usually contains 2 main sections, Bar chart and activity list. to understand the time schedule accurate and fast you should

    A-READ THE COLORS FIRST

    B-READ THE DATA

    Watch the following video

    Want more about project management?

    Check Primavera Course for Engineers & Construction Managers!

    Tag:Construction Managers, oracle primavera, p6, Project Managers, schedule, Site Engineers, time schedule

    • Share:
    Hany Ismail, MSC, PMP
    Hany Ismail, MSC, PMP

    Hany Ismael is the founder and CEO of Planning Engineer Est. in Egypt. He has started his career back in 2003 as a site engineer, technical office engineer, planning engineer, planning manager, and finally planning department manager where he has been involved in several mega construction projects in Egypt and Saudi Arabia. In 2016, he established his own company in Egypt “Planning Engineer Est.” Hany gained his MSc degree in project management from Liverpool University-UK 2013-2016, PMP certified from PMI-USA 2010, and BSc Civil Engineer Tanta University-Egypt 2003. Hany provided more than 3,500 hours of planning and project management training on his website planningengineer.net, YouTube channel, and offline courses since 2011. He enjoys teaching project management in simple and practical way, and he developed several planning tools, techniques and courses.

    Previous post

    How to make Layouts in Primavera P6
    April 20, 2014

    Next post

    Project Systems that work!
    April 21, 2014

    You may also like

    Remove Actuals using Global Change cover
    Remove Primavera P6 Actuals using Global Change
    24 January, 2022
    Bulk Delete Relationships in P6 cover
    Bulk Delete Relationships in P6
    20 January, 2022
    img_0237.png
    Primavera P6 Calendar 10 Tips and Tricks
    18 November, 2020

    Leave A Reply Cancel reply

    You must be logged in to post a comment.

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....