Construction Planning Q&A 28-Nov-2021
Live Planning Discussion where we discussed the following topics:
1-how can I link Primavera 20.1 with SDK application, but I failed to solve this problem till now. Could you prepare a video to solve this problem, please? (1:45)
2- I want to show 7 days calendar only on top of the program…I already change the calendar on defaults 7 days but still on the program not showing 7 days (4:21)
3- Can a delay analysis be prepared using an unapproved baseline (8:01)
4- I learn primavera from my friend and self struggle now I want to be it’s practice how can I get a chance in GCC. Have you any idea? (14:05)
5-
6- Does the approval of EOT as a result of suspension or design modifications explicitly mean that a project extension cost is due to the contractor? (21:17)
7- Which methodology is best to describe late payment-related delays? (22:20)
8- Only critical path activities can delay your project, also not all critical path activities can delay your project. How true is this assertion? (26:52)
9- In delay analysis should we consider calculating delays based on float path order? (29:50)
10-
11- How to give SS relationships at one time for more than 100 activities (31:20)
12- How to remove successor relationship at one time (31:49)
13-
14- Could you tell us how to apply the crushing method on the Primavera schedule? Like, changing fixed duration and time to fixed duration and unit/time! (44:19)
15- how to prepare for a claim as a planner engineer! (46:37)
16- Which is the best delay analysis technique to b utilized fr EPC projects? (47:53)
17- Is the planner compelled to use a particular delay analysis technique by the main contractor? (49:23)
5- where we can practice real projects in primavera? (51:25)
8- Hello Engr. Hany, my question is regarding Power Bi. If my company doesn’t own an official Microsoft organization email id. Is there any easy method to publish the interactive report in html format so that it can be easily shared and projected and discussed during meetings? (52:58)
20- How to add the cost of those activities/resources which are not used consistently? like 1 Electrician on multiple projects? (1:03:09)
21- what is the best way to represent Project Management in your program. LOE or WBS summary (1:06:00)
Note: The Timing above between this () is the time comment posted during the live session, usually, I reply within 2 to 5 minutes from this time.
Do you want to join my next live session? Follow me on social media so you will get a notification when I schedule a live session:
1- Subscribe to YouTube Channel: Planning Engineer
2- Like FaceBook Page: Planning Engineer
3- Follow Linked In Page: Planning Engineer
Tag:best delay analysis technique, chance in GCC, critical path, crushing method on the Primavera, delay analysis, particular delay analysis technique, powerbi, practice real projects in primavera, publish the interactive report, remove successor relationship at one time, SS relationships at one time