Construction Planning Q&A 13-Dec-2021
Live Planning Discussion where we discussed the following topics:
1-If I have a project with 2 contractors and everyone has a separate schedule can you explain to us how to make an update?
2- Question with another way if having 2 contractors how can merge the two schedules and update throughout the project construction ?????
3-How can I know that the schedule covers all the scope if I am new in an existing project ???
4-if want to study claims from where can I start, from which point?
5-if I have intermediate milestones is should put any constraints to fix them?
6-Hi, I am currently taking your Power BI course, While so, one question constantly comes to my mind, what if the baseline change?
7-We have activities A > FS > B. But B started earlier than A. We changed the “update” link to A > FF > B and recorded that in the changelog. Did we do right?
8-When we go to EOT would we change the baseline same as the log before the EOT study? Is that in our favor or against us and better to ignore?
9- kindly give your view and guidance for the PMP exam.
10- How many projects through your lifetime made the cost control as it should be.
11- collecting Actual Costs for each activity and comparing with the planned budgeted cost. And also have u have was able to load the program with the actual manpower used?
12- How to fix event code TPCAT-2162-1 when importing excel to primavera
13- what you are explaining is if the setup is for retained logic, what if it is Progress Override?
14- Someone is Planning Engineer in the infrastructure industry for the last 5 yrs and gets a chance to work on some other projects of Pharma etc as PMO ( Agile, Scrum Master, etc). Is it a good option or not?
15- After preparing a revised program which becomes your new baseline?
16- In revised program preparation do u detach your baseline?
17- I have prepared a revised program, but my plan % is not equal to the actual, how do I solve this?
18- How does primavera calculate the percentage of WBS summary activity?
19- Does the December offer (on planning engineer web) includes the new course
20- What is the difference between recovery and a revised schedule.
21- What is the best way to report progress to my management, they don’t care about Physical/Unit/Duration % complete, they just want to know how far the project is?
22- Are you hiring planning engineers?
Keep in touch and Follow US:
Twitter: https://twitter.com/PlanningEEst
YouTube: https://www.youtube.com/c/PlanningengineerNet/
Linked in: https://www.linkedin.com/company/planning-engineer-est/
Instagram: https://www.instagram.com/planningengineerest/
FaceBook: https://www.facebook.com/PlanningEngineerDotNet
WhatsApp: +201277767728
Email: [email protected]
Ready to take your skills to the next level? 🚀 Check out our Special Online Courses! 🚀
Gain valuable insights, boost your career, and learn from industry experts.
Watch the Recorded Version of the Live session:
Keep growing with Planning Engineer
Learn with a clear path
From Primavera P6 basics to claims, cost control and Power BI. Start with our free courses.
Browse coursesGet help on WhatsApp
Every course comes with a private WhatsApp support group where our team answers your questions.
Join a courseFind planning jobs
25 open planning and project control jobs. Post your resume so employers can find you.
See jobsGet tips by email
Free planning tips, templates and course offers. Unsubscribe any time.