Construction Planning Q&A 13-Dec-2021
Live Planning Discussion where we discussed the following topics:
1-If I have a project with 2 contractors and everyone has a separate schedule can you explain to us how to make an update?
2- Question with another way if having 2 contractors how can merge the two schedules and update throughout the project construction ?????
3-How can I know that the schedule covers all the scope if I am new in an existing project ???
4-if want to study claims from where can I start, from which point?
5-if I have intermediate milestones is should put any constraints to fix them?
6-Hi, I am currently taking your Power BI course, While so, one question constantly comes to my mind, what if the baseline change?
7-We have activities A > FS > B. But B started earlier than A. We changed the “update” link to A > FF > B and recorded that in the changelog. Did we do right?
8-When we go to EOT would we change the baseline same as the log before the EOT study? Is that in our favor or against us and better to ignore?
9- kindly give your view and guidance for the PMP exam.
10- How many projects through your lifetime made the cost control as it should be.
11- collecting Actual Costs for each activity and comparing with the planned budgeted cost. And also have u have was able to load the program with the actual manpower used?
12- How to fix event code TPCAT-2162-1 when importing excel to primavera
13- what you are explaining is if the setup is for retained logic, what if it is Progress Override?
14- Someone is Planning Engineer in the infrastructure industry for the last 5 yrs and gets a chance to work on some other projects of Pharma etc as PMO ( Agile, Scrum Master, etc). Is it a good option or not?
15- After preparing a revised program which becomes your new baseline?
16- In revised program preparation do u detach your baseline?
17- I have prepared a revised program, but my plan % is not equal to the actual, how do I solve this?
18- How does primavera calculate the percentage of WBS summary activity?
19- Does the December offer (on planning engineer web) includes the new course
20- What is the difference between recovery and a revised schedule.
21- What is the best way to report progress to my management, they don’t care about Physical/Unit/Duration % complete, they just want to know how far the project is?
22- Are you hiring planning engineers?
Keep in touch and Follow US:
Twitter: https://twitter.com/PlanningEEst
YouTube: https://www.youtube.com/c/PlanningengineerNet/
Linked in: https://www.linkedin.com/company/planning-engineer-est/
Instagram: https://www.instagram.com/planningengineerest/
FaceBook: https://www.facebook.com/PlanningEngineerDotNet
WhatsApp: +201277767728
Email: [email protected]
Watch the Recorded Version of the Live session: