• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    management

    • Home
    • management
    Showing 1-10 of 396 results
    Hany Ismail, MSC, PMP Hany Ismail, MSC, PMP

    60+ Project Management PMP Templates

    • Posted by Hany Ismail, MSC, PMP
    • Categories Project Management
    • Comments 3 comments
    October 16, 2014
    3

    Download more than 60 project management templates based on PMP. These excel templates are useful for whoever interested in project management field.   60+ Project Management Templates in MS word and Excel. These templates are very useful for people study …

    Read More
    blank
    Hany Ismail, MSC, PMP Hany Ismail, MSC, PMP

    Corporate and Program management

    • Posted by Hany Ismail, MSC, PMP
    • Categories Project Management
    • Comments 0 comment
    March 20, 2014
    0

    Project management is a lot similar to corporate management. The only major difference is that with project management, the flow of the processes is sequential and moves from one step to the other systematically. Corporate management on the other hand …

    Read More
    blank
    Hany Ismail, MSC, PMP Hany Ismail, MSC, PMP

    Combating the funding challenge

    • Posted by Hany Ismail, MSC, PMP
    • Categories Planning Discussions, Project Management
    • Comments 0 comment
    March 16, 2014
    0

    Funding is a very key aspect of any project. For the success of a project the funding needs to be adequate and managed in the right manner. At times the funding is not as anticipated and you have to work …

    Read More
    blank
    Hany Ismail, MSC, PMP Hany Ismail, MSC, PMP

    Arabic-English Project Management Dictionary

    • Posted by Hany Ismail, MSC, PMP
    • Categories Management Template, Planning Discussions, Project Management
    • Comments 0 comment
    January 28, 2014
    0

    Arabic English dictionary for the most used words in project management.

    Read More
    blank
    Hany Ismail, MSC, PMP Hany Ismail, MSC, PMP

    Requirement Management Plan Template

    • Posted by Hany Ismail, MSC, PMP
    • Categories Management Template
    • Comments 0 comment
    January 27, 2014
    0

    Requirement Management Plan Template with description of Each Field data, what is required and how to be filled.

    Read More
    blank
    Hany Ismail, MSC, PMP Hany Ismail, MSC, PMP

    Build your Dream First

    • Posted by Hany Ismail, MSC, PMP
    • Categories pic worth a 1000 words, Planning Discussions
    • Comments 0 comment
    January 15, 2014
    0

    Build your dream
    If you don’t build your dream, someone else will hire you to build theirs. This is a very true and shocking statement.
    There was a famous statement “love what you work to work what you love.” I was convinced about this statement. However, after deep thinking, and after I read the statement subject to this post. I realized that in order to work what you love you need to build it yourself first.

    Read More
    blank
    Hany Ismail, MSC, PMP Hany Ismail, MSC, PMP

    Do not let your expectation deviate your judgment

    • Posted by Hany Ismail, MSC, PMP
    • Categories pic worth a 1000 words
    • Comments 0 comment
    January 4, 2014
    0

    This photo is shocking for you right? From your expectation, your mind predicted which element would be broken. However, the reality sometimes is different.

    Read More
    blank
    Hany Ismail, MSC, PMP Hany Ismail, MSC, PMP

    Your plan and the reality

    • Posted by Hany Ismail, MSC, PMP
    • Categories pic worth a 1000 words
    • Comments 0 comment
    January 3, 2014
    0

    Whenever we create a plan, we cannot predict the problems and the challenges we could face to reach our goal. Creating a project management plan is a challenge to the project management team. Especially to accommodate the changes and the …

    Read More
    blank
    Hany Ismail, MSC, PMP Hany Ismail, MSC, PMP

    Do not be too confident!

    • Posted by Hany Ismail, MSC, PMP
    • Categories pic worth a 1000 words
    • Comments 0 comment
    January 1, 2014
    0

    Being involved on the project management field, especially in the construction planning taught me the value of accuracy. I am dealing with numbers, figures, and percentages. Analyzing huge amount of date in order to report maybe a single number or percentage to my manager.

    Read More
    blank
    Hany Ismail, MSC, PMP Hany Ismail, MSC, PMP

    Project Management from Directory

    • Posted by Hany Ismail, MSC, PMP
    • Categories Management Template
    • Comments 0 comment
    February 28, 2013
    0

    Project Management from Directory includes all Project Management from and excel spread sheets for project management all in one place, all files can be downloaded easily by one click. This project management templates are useful for planning engineers, project managers, construction mangers and …

    Read More
    • 1
    • 2
    • >

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00
    blank

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....