    • PROJECT PERFORMANCE REPORT

    PROJECT PERFORMANCE REPORT

    • Posted by Hany Ismail, MSC, PMP
    • Categories Management Template
    • Date February 9, 2014
    • Comments 0 comment

    PROJECT PERFORMANCE REPORT Template in word format with description what is required in each field to fill

    Project Title:

    Date Prepared:

     

    Project Manager:

    Sponsor:

     

    Accomplishments for This Reporting Period:
    1. List all work packages or other accomplishments scheduled for completion this period.

     

    Accomplishments Planned but Not Completed This Reporting Period:
    1. List all work packages or other accomplishments scheduled for this period but not completed.

     

    Root Cause of Variances:
    For any work that was not accomplished as scheduled, identify cause of variance.

     

    Impact to Upcoming Milestones or Project Due Date:
    For any work that was not accomplished as scheduled, identify any impact to upcoming milestones or overall project schedule. Identify any work currently behind on the critical path or if the critical path has changed based on the variance.

     

    Planned Corrective or Preventive Action:

    Identify any actions needed to make up schedule variances or prevent future schedule variances.

     

    Funds Spent This Reporting Period:

    Record funds spent this period.

     

    Root Cause of Variances:

    For any expenditures that were over or under plan, identify cause of the variance. Include information on labor variance versus material variances.

     

    Impact to Overall Budget or Contingency Funds:
    For cost variances, indicate impact to the overall project budget or whether contingency funds must be expended.

     

    Planned Corrective or Preventive Action:

    Identify any actions needed to recover cost variances or prevent future schedule variances.

     

    Accomplishments Planned for Next Reporting Period:

    1. List all work packages or accomplishments scheduled for completion next period.

     

    Costs Planned for Next Reporting Period:

    Identify funds planned to be expended next period.

     

    New Risks Identified:
    Identify any new risks that have arisen this period. These risks should be recorded in the Risk Register as well.

     

    Issues:

    Identify any new issues that have arisen this period. These issues should be recorded in the Issue Log as well.

     

    Comments:

    Record any comments that add relevance to the report.

     

    Download PROJECT PERFORMANCE REPORT word Template: PROJECT PERFORMANCE REPORT

    Tag:PERFORMANCE REPORT, PERFORMANCE template, PERFORMANCE word REPORT, period list, period nbsp, project performance, reporting period, schedule variances

    • Share:
    Hany Ismail, MSC, PMP
    Hany Ismail, MSC, PMP

    Hany Ismael is the founder and CEO of Planning Engineer Est. in Egypt. He has started his career back in 2003 as a site engineer, technical office engineer, planning engineer, planning manager, and finally planning department manager where he has been involved in several mega construction projects in Egypt and Saudi Arabia. In 2016, he established his own company in Egypt “Planning Engineer Est.” Hany gained his MSc degree in project management from Liverpool University-UK 2013-2016, PMP certified from PMI-USA 2010, and BSc Civil Engineer Tanta University-Egypt 2003. Hany provided more than 3,500 hours of planning and project management training on his website planningengineer.net, YouTube channel, and offline courses since 2011. He enjoys teaching project management in simple and practical way, and he developed several planning tools, techniques and courses.

    Previous post

    Batching Of Concrete Method Statement
    February 9, 2014

    Next post

    Ceramic Tiles, Terrazzo Tiles and Mosaics Method Statement
    February 10, 2014

    You may also like

    2022-06-19_11-56-47
    Sample Weekly and Monthly Reports
    20 June, 2022
    Power Bi
    Power BI is the next level of data analytics and visualization
    20 February, 2019
    MEP-Engineer-Job-Description
    MEP Engineer Job Description template
    24 November, 2018

    Leave A Reply Cancel reply

    You must be logged in to post a comment.

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....