• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    Introduction-lesson-2-How-to-perform-cost-control

    • Home
    • Introduction-lesson-2-How-to-perform-cost-control

    Introduction-lesson-2-How-to-perform-cost-control

    • Posted by Hany Ismail, MSC, PMP
    • Date September 9, 2021
    • Comments 0 comment
    [featured_image]
    Download
    • Version
    • Download 109
    • File Size 2.72 MB
    • File Count 1
    • Create Date September 9, 2021
    • Last Updated September 9, 2021

    Introduction-lesson-2-How-to-perform-cost-control

    Attached Files

    FileAction
    Course-Control-Course-Introduction-lesson-2-How-to-perform-cost-control.pdfDownload
    • Share:
    Hany Ismail, MSC, PMP
    Hany Ismail, MSC, PMP

    Hany Ismael is the founder and CEO of Planning Engineer Est. in Egypt. He has started his career back in 2003 as a site engineer, technical office engineer, planning engineer, planning manager, and finally planning department manager where he has been involved in several mega construction projects in Egypt and Saudi Arabia. In 2016, he established his own company in Egypt “Planning Engineer Est.” Hany gained his MSc degree in project management from Liverpool University-UK 2013-2016, PMP certified from PMI-USA 2010, and BSc Civil Engineer Tanta University-Egypt 2003. Hany provided more than 3,500 hours of planning and project management training on his website planningengineer.net, YouTube channel, and offline courses since 2011. He enjoys teaching project management in simple and practical way, and he developed several planning tools, techniques and courses.

    Previous post

    Cost-Control-Course-Introduction-lesson-1-Introduction
    September 9, 2021

    Next post

    Course-Control-Course-Introduction-lesson-3-How-it-works-in-this-course
    September 9, 2021

    You may also like

    2022-06-19_11-56-47
    Sample Weekly and Monthly Reports
    20 June, 2022
    How to become a planning engineer
    How to be prepared to work as a junior planning engineer?
    22 May, 2022
    Materials Procurement Scheduling in a Baseline Programme
    Materials Procurement Scheduling in a Baseline Programme
    7 May, 2022

    Leave A Reply Cancel reply

    You must be logged in to post a comment.

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....