
Planning Engineer — 7 years
🎯 Career level: Senior Planning Engineer (5–10 yrs)
Only candidates whose resume career level is Senior Planning Engineer (5–10 yrs) can apply for this job.
Only candidates whose resume career level is Senior Planning Engineer (5–10 yrs) can apply for this job.
📍 Local candidates only
This employer accepts applications only from candidates currently located in United Arab Emirates (UAE).
This employer accepts applications only from candidates currently located in United Arab Emirates (UAE).

Website PlanningJobs Afaqengineering
WE ARE HIRING | DUBAI, UAE
AFAQ Engineering for Building Contracting LLC is looking for experienced professionals to join our team.
OPEN POSITIONS — MINIMUM EXPERIENCE
▪ Cost Control Engineer — 7 years
▪ Planning Engineer — 7 years
✅ MANDATORY REQUIREMENTS
• The minimum experience specified above must be in high-rise building construction in the UAE.
• Candidates must currently be available in the UAE.






