
PLANNING ENGINEER*
🎯 Career level: Senior Planning Engineer (5–10 yrs)
Only candidates whose resume career level is Senior Planning Engineer (5–10 yrs) can apply for this job.
Only candidates whose resume career level is Senior Planning Engineer (5–10 yrs) can apply for this job.
📍 Local candidates only
This employer accepts applications only from candidates currently located in United Arab Emirates (UAE).
This employer accepts applications only from candidates currently located in United Arab Emirates (UAE).

Website PlanningJobs Candidzone
*WE ARE HIRING – PLANNING ENGINEER*
Location: Doha
Duration: 3months
Valid Qid Required
Requirements:
• Bachelor’s Degree in Civil, Mechanical, Electrical Engineering or a related discipline.
• 5–8 years of relevant experience in project planning and scheduling.
• Experience in EPC / large-scale construction projects.
• Experience in Infrastructure, Water, Wastewater or Sewage Treatment Plant projects is preferred.
• Proficiency in Primavera P6 is mandatory.
• Experience preparing baseline programmes, recovery schedules, S-curves and progress reports.






