Line of Balance Excel Tool
- Version
- Download 6473
- File Size 21.56 KB
- File Count 1
- Create Date February 25, 2024
- Last Updated December 16, 2024
Line of Balance Excel Tool
[__wpdm_package id='122232']
Attached Files
| File | Action |
|---|---|
| Line-of-Balance-Excel-Tool.xlsx | Download |
Leave A Reply
You must be logged in to post a comment.




2 Comments
Brilliant, thinking out of the common minds, LOB is a powerful technique to control schedule, it depends on the real production rates , the tangent angle of the inclined line represents the relation between the duration and productivity, unlike the other tools the productive rates inbeded and hide inside the horizontal line, and that is the major reasons of delays in the construction projects
Brilliant, thinking away from the common minds, LOB is a powerful technique to control schedule, it depends on the real production rates , the tangent angle of the inclined line represents the relation between the duration and productivity, unlike the other tools the productive rates inbeded and hide inside the horizontal line, and that is the major reasons of delays in the construction projects