• Home
  • Forums
  • Blog
  • Courses
  • Tools
  • Jobs
    Have any question?
    (00) 201277767728
    [email protected]
    RegisterLogin
    Planning Engineer Est.
    • Home
    • Forums
    • Blog
    • Courses
    • Tools
    • Jobs

      Power Bi Monitoring and Controlling with P6

      • Home
      • All courses
      • featured
      • Power Bi Monitoring and Controlling with P6
      CoursesMonitoringPower Bi Monitoring and Controlling with P6
      • Start Using Power Bi
        10
        • Lecture1.1
          Download and Install Power Bi Free From Microsoft. 04 min
        • Lecture1.2
          Power Bi First Look. 06 min
        • Lecture1.3
          Create Your First Interactive Report In 12 Minutes Or Less. 12 min
        • Lecture1.4
          How To Share Your Reports With Others? 07 min
        • Lecture1.5
          Power Bi Home Tap 19 min
        • Lecture1.6
          Power Bi View Tap 04 min
        • Lecture1.7
          Power Bi Modeling Tap 06 min
        • Lecture1.8
          Power Bi Fields Area 04 min
        • Lecture1.9
          Power Bi Visualization Area 16 min
        • Lecture1.10
          Save Reports To Pdf 04 min
      • Get The Data From Primavera Schedule
        6
        • Lecture2.1
          Convert WBS to Activity Codes Part 1 18 min
        • Lecture2.2
          Activity Codes Tips and Tricks 47 min
        • Lecture2.3
          Convert Primavera Expenses to Resources 12 min
        • Lecture2.4
          How To Get The Baseline Dates From Primavera using our Excel Tool 10 min
        • Lecture2.5
          How To Get The Cost Per Week From Primavera using our Excel Tool 18 min
        • Lecture2.6
          How To Get The Update from Primavera (cost and resources) using our excel tool 16 min
      • Weekly Progress Report
        6
        • Lecture3.1
          Create Floor wise Weekly Planned Value VS Actual Value Chart 21 min
        • Lecture3.2
          Create Cumulative Planned VS Actual Weekly Value per Floor 17 min
        • Lecture3.3
          Clone the Weekly Values Report and Convert it to Weekly Hours Report 12 min
        • Lecture3.4
          Create Weekly Resources Assignment Report 05 min
        • Lecture3.5
          Activity Wise Detailed Weekly Report 20 min
        • Lecture3.6
          Review of Reports and Data- How to validate your data 14 min
      • Shop Drawings and Materials Reports
        1
        • Lecture4.1
          Create shop drawings and materials reports 05 min
      • Look Ahead Schedule Reports
        1
        • Lecture5.1
          Dynamic 5 Weeks Look Ahead Schedule 15 min
      • Delayed/Ahead Activities Reports
        1
        • Lecture6.1
          Delayed and Ahead Activities Report 06 min
      • Cost Control (Actual V.S Budget Cost, Man hours)
        2
        • Lecture7.1
          Cost Control (Actual V.S Budget Man hours) 25 min
        • Lecture7.2
          Cost Control (Actual V.S Budget Cost) 55 min
      • Overall Project Summary Dashboard
        1
        • Lecture8.1
          Overall Project Summary Dashboard 16 min
      • Enterprise Report For More Than One Project
        1
        • Lecture9.1
          Enterprise Report For More Than One Project 14 min
      • Create An Interactive Online Resume By Power Bi
        1
        • Lecture10.1
          Create An Interactive Online Resume By Power Bi 17 min
      • Continuous Improvement and Access to Support Forums
        1
        • Lecture11.1
          Continuous Improvement and Access to Support Forums 05 min
      • Course Completion Certificate
        1
        • Lecture12.1
          Download your PowerBi and Primavera Course Certificate
      • Bonus Course: Progress Measurement System- Downloadable Course
        2
        • Lecture13.1
          Course Download Links
        • Lecture13.2
          Progress Measurement System Certificate
        This content is protected, please login and enroll course to view this content!
        Prev Dynamic 5 Weeks Look Ahead Schedule
        Next Cost Control (Actual V.S Budget Man hours)

        Leave A Reply Cancel reply

        You must be logged in to post a comment.

        Follow Us:

        About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

        Copyright ©2012- 2020 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

        • Planning Courses
        • Planning Jobs
        • Planning Blog

        Login with your site account

        Lost your password?

        Not a member yet? Register now

        Register a new account

        Are you a member? Login now

        Modal title

        Message modal