• Home
  • Forums
  • Blog
  • Courses
  • Tools
  • Jobs
    Have any question?
    (00) 201277767728
    [email protected]
    RegisterLogin
    Planning Engineer Est.Planning Engineer Est.
    • Home
    • Forums
    • Blog
    • Courses
    • Tools
    • Jobs

      Monitoring and Controlling Using Power Bi and Primavera P6 -PMC

      • Home
      • All courses
      • featured
      • Monitoring and Controlling Using Power Bi and Primavera P6 -PMC
      CoursesMonitoringMonitoring and Controlling Using Power Bi and Primavera P6 -PMC
      • Start Using Power Bi 10

        • Lecture1.1
          Download and Install Power Bi Free From Microsoft. 04 min
        • Lecture1.2
          Power Bi First Look. 06 min
        • Lecture1.3
          Create Your First Interactive Report In 12 Minutes Or Less. 12 min
        • Lecture1.4
          How To Share Your Reports With Others? 07 min
        • Lecture1.5
          Power Bi Home Tap 19 min
        • Lecture1.6
          Power Bi View Tap 04 min
        • Lecture1.7
          Power Bi Modeling Tap 06 min
        • Lecture1.8
          Power Bi Fields Area 04 min
        • Lecture1.9
          Power Bi Visualization Area 16 min
        • Lecture1.10
          Save Reports To Pdf 04 min
      • Get The Data From Primavera Schedule 6

        • Lecture2.1
          Convert WBS to Activity Codes Part 1 18 min
        • Lecture2.2
          Activity Codes Tips and Tricks 47 min
        • Lecture2.3
          Convert Primavera Expenses to Resources 12 min
        • Lecture2.4
          How To Get The Baseline Dates From Primavera using our Excel Tool 10 min
        • Lecture2.5
          How To Get The Cost Per Week From Primavera using our Excel Tool 18 min
        • Lecture2.6
          How To Get The Update from Primavera (cost and resources) using our excel tool 16 min
      • Weekly Progress Report 6

        • Lecture3.1
          Create Floor wise Weekly Planned Value VS Actual Value Chart 21 min
        • Lecture3.2
          Create Cumulative Planned VS Actual Weekly Value per Floor 17 min
        • Lecture3.3
          Clone the Weekly Values Report and Convert it to Weekly Hours Report 12 min
        • Lecture3.4
          Create Weekly Resources Assignment Report 05 min
        • Lecture3.5
          Activity Wise Detailed Weekly Report 20 min
        • Lecture3.6
          Review of Reports and Data- How to validate your data 14 min
      • Shop Drawings and Materials Reports 1

        • Lecture4.1
          Create shop drawings and materials reports 05 min
      • Look Ahead Schedule Reports 1

        • Lecture5.1
          Dynamic 5 Weeks Look Ahead Schedule 15 min
      • Delayed/Ahead Activities Reports 1

        • Lecture6.1
          Delayed and Ahead Activities Report 06 min
      • Cost Control (Actual V.S Budget Cost, Man hours) 2

        • Lecture7.1
          Cost Control (Actual V.S Budget Man hours) 25 min
        • Lecture7.2
          Cost Control (Actual V.S Budget Cost) 55 min
      • Overall Project Summary Dashboard 1

        • Lecture8.1
          Overall Project Summary Dashboard 16 min
      • Enterprise Report For More Than One Project 1

        • Lecture9.1
          Enterprise Report For More Than One Project 14 min
      • Create An Interactive Online Resume By Power Bi 1

        • Lecture10.1
          Create An Interactive Online Resume By Power Bi 17 min
      • Continuous Improvement and Access to Support Forums 1

        • Lecture11.1
          Continuous Improvement and Access to Support Forums 05 min
      • Course Completion Certificate 1

        • Lecture12.1
          Download your PowerBi and Primavera Course Certificate
      • Bonus Course: Progress Measurement System- Downloadable Course 2

        • Lecture13.1
          Course Download Links
        • Lecture13.2
          Progress Measurement System Certificate
        This content is protected, please login and enroll course to view this content!
        Prev Delayed and Ahead Activities Report
        Next Cost Control (Actual V.S Budget Cost)

        Leave A Reply Cancel reply

        You must be logged in to post a comment.

        Connect with:

        Login with Google Login with Twitter Login with LinkedIn

        Follow Us:

        Copyright ©2012- 2019 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

        • Planning Courses
        • Planning Jobs
        • Planning Blog

        Login with your site account

        Connect with:

        Login with Google Login with Twitter Login with LinkedIn

        Lost your password?

        Not a member yet? Register now

        Register a new account

        Connect with:

        Login with Google Login with Twitter Login with LinkedIn

        Are you a member? Login now