Have any question?
(00) 201277767728
[email protected]
RegisterLogin
Planning Engineer Est.Planning Engineer Est.
  • Start Here!
  • Home
  • Forums
  • Blog
  • Courses
  • Tools
      • Cart

        0

    Advanced Planning

    • Home
    • All courses
    • Advanced Planning
    • Monitoring and Controlling Using Power Bi and Primavera P6 -PMC
    Planning Engineer Training-Online Oracle Primavera p6 Training CoursesAdvanced PlanningMonitoring and Controlling Using Power Bi and Primavera P6 -PMC
    • Start Using Power Bi 10

      • Lecture1.1
        Download and Install Power Bi Free From Microsoft. 04 min
      • Lecture1.2
        Power Bi First Look. 06 min
      • Lecture1.3
        Create Your First Interactive Report In 12 Minutes Or Less. 12 min
      • Lecture1.4
        How To Share Your Reports With Others? 07 min
      • Lecture1.5
        Power Bi Home Tap 19 min
      • Lecture1.6
        Power Bi View Tap 04 min
      • Lecture1.7
        Power Bi Modeling Tap 06 min
      • Lecture1.8
        Power Bi Fields Area 04 min
      • Lecture1.9
        Power Bi Visualization Area 16 min
      • Lecture1.10
        Save Reports To Pdf 04 min
    • Get The Data From Primavera Schedule 6

      • Lecture2.1
        Convert WBS to Activity Codes Part 1 18 min
      • Lecture2.2
        Activity Codes Tips and Tricks 47 min
      • Lecture2.3
        Convert Primavera Expenses to Resources 12 min
      • Lecture2.4
        How To Get The Baseline Dates From Primavera using our Excel Tool 10 min
      • Lecture2.5
        How To Get The Cost Per Week From Primavera using our Excel Tool 18 min
      • Lecture2.6
        How To Get The Update from Primavera (cost and resources) using our excel tool 16 min
    • Weekly Progress Report 6

      • Lecture3.1
        Create Floor wise Weekly Planned Value VS Actual Value Chart 21 min
      • Lecture3.2
        Create Cumulative Planned VS Actual Weekly Value per Floor 17 min
      • Lecture3.3
        Clone the Weekly Values Report and Convert it to Weekly Hours Report 12 min
      • Lecture3.4
        Create Weekly Resources Assignment Report 05 min
      • Lecture3.5
        Activity Wise Detailed Weekly Report 20 min
      • Lecture3.6
        Review of Reports and Data- How to validate your data 14 min
    • Shop Drawings and Materials Reports 1

      • Lecture4.1
        Create shop drawings and materials reports 05 min
    • Look Ahead Schedule Reports 1

      • Lecture5.1
        Dynamic 5 Weeks Look Ahead Schedule 15 min
    • Delayed/Ahead Activities Reports 1

      • Lecture6.1
        Delayed and Ahead Activities Report 06 min
    • Cost Control (Actual V.S Budget Cost, Man hours) 2

      • Lecture7.1
        Cost Control (Actual V.S Budget Man hours) 25 min
      • Lecture7.2
        Cost Control (Actual V.S Budget Cost)
    • Overall Project Summary Dashboard 1

      • Lecture8.1
        Overall Project Summary Dashboard
    • Enterprise Report For More Than One Project 1

      • Lecture9.1
        Enterprise Report For More Than One Project
    • Create An Interactive Online Resume By Power Bi 1

      • Lecture10.1
        Create An Interactive Online Resume By Power Bi
    • Continuous Improvement and Access to Support Forums 1

      • Lecture11.1
        Continuous Improvement and Access to Support Forums
    • Course Completion Certificate 1

      • Lecture12.1
        Download your PowerBi and Primavera Course Certificate
      This content is protected, please login and enroll course to view this content!
      Prev Review of Reports and Data- How to validate your data
      Next Dynamic 5 Weeks Look Ahead Schedule

      Leave A Reply Cancel reply

      You must be logged in to post a comment.

      Connect with:

      Login with Facebook Login with Google Login with Twitter Login with LinkedIn

      Your Cart

      All Courses

      • Advanced Planning
      • Basic Planning
      • featured
      • Microsoft Excel
      • Others

      Latest Courses

      Monitoring and Controlling Using Power Bi and Primavera P6 -PMC

      Monitoring and Controlling Using Power Bi and Primavera P6 -PMC

      $300.00
      Planning Advanced Package- 3 Professional Courses and Primavera 50 Tips

      Planning Advanced Package- 3 Professional Courses and Primavera 50 Tips

      $500.00
      Data Management and Planning Reporting Skills

      Data Management and Planning Reporting Skills

      $200.00
      logo-eduma-the-best-lms-wordpress-theme

      Planning Engineer Est.

      (00) 201277767728

      [email protected]

      Follow us:

      Company

      • About Us
      • Contact Us
      • Terms of Service
      • Privacy Policy
      • Refund Policy

      Get our Featured Content

      Copyright ©2012- 2019 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

      • Primavera p6 Training
      • Planning Tools
      • Planning Blog