• Home
  • Forums
  • Blog
  • Courses
  • Tools
  • Jobs
    Have any question?
    (00) 201277767728
    [email protected]anningengineer.net
    RegisterLogin
    Planning Engineer Est.
    • Home
    • Forums
    • Blog
    • Courses
    • Tools
    • Jobs

      Power Bi Monitoring and Controlling with P6

      • Home
      • All courses
      • featured
      • Power Bi Monitoring and Controlling with P6
      CoursesMonitoringPower Bi Monitoring and Controlling with P6
      • Start Using Power Bi
        10
        • Lecture1.1
          Download and Install Power Bi Free From Microsoft. 04 min
        • Lecture1.2
          Power Bi First Look. 06 min
        • Lecture1.3
          Create Your First Interactive Report In 12 Minutes Or Less. 12 min
        • Lecture1.4
          How To Share Your Reports With Others? 07 min
        • Lecture1.5
          Power Bi Home Tap 19 min
        • Lecture1.6
          Power Bi View Tap 04 min
        • Lecture1.7
          Power Bi Modeling Tap 06 min
        • Lecture1.8
          Power Bi Fields Area 04 min
        • Lecture1.9
          Power Bi Visualization Area 16 min
        • Lecture1.10
          Save Reports To Pdf 04 min
      • Get The Data From Primavera Schedule
        6
        • Lecture2.1
          Convert WBS to Activity Codes Part 1 18 min
        • Lecture2.2
          Activity Codes Tips and Tricks 47 min
        • Lecture2.3
          Convert Primavera Expenses to Resources 12 min
        • Lecture2.4
          How To Get The Baseline Dates From Primavera using our Excel Tool 10 min
        • Lecture2.5
          How To Get The Cost Per Week From Primavera using our Excel Tool 18 min
        • Lecture2.6
          How To Get The Update from Primavera (cost and resources) using our excel tool 16 min
      • Weekly Progress Report
        6
        • Lecture3.1
          Create Floor wise Weekly Planned Value VS Actual Value Chart 21 min
        • Lecture3.2
          Create Cumulative Planned VS Actual Weekly Value per Floor 17 min
        • Lecture3.3
          Clone the Weekly Values Report and Convert it to Weekly Hours Report 12 min
        • Lecture3.4
          Create Weekly Resources Assignment Report 05 min
        • Lecture3.5
          Activity Wise Detailed Weekly Report 20 min
        • Lecture3.6
          Review of Reports and Data- How to validate your data 14 min
      • Shop Drawings and Materials Reports
        1
        • Lecture4.1
          Create shop drawings and materials reports 05 min
      • Look Ahead Schedule Reports
        1
        • Lecture5.1
          Dynamic 5 Weeks Look Ahead Schedule 15 min
      • Delayed/Ahead Activities Reports
        1
        • Lecture6.1
          Delayed and Ahead Activities Report 06 min
      • Cost Control (Actual V.S Budget Cost, Man hours)
        2
        • Lecture7.1
          Cost Control (Actual V.S Budget Man hours) 25 min
        • Lecture7.2
          Cost Control (Actual V.S Budget Cost) 55 min
      • Overall Project Summary Dashboard
        1
        • Lecture8.1
          Overall Project Summary Dashboard 16 min
      • Enterprise Report For More Than One Project
        1
        • Lecture9.1
          Enterprise Report For More Than One Project 14 min
      • Create An Interactive Online Resume By Power Bi
        1
        • Lecture10.1
          Create An Interactive Online Resume By Power Bi 17 min
      • Continuous Improvement and Access to Support Forums
        1
        • Lecture11.1
          Continuous Improvement and Access to Support Forums 05 min
      • Course Completion Certificate
        1
        • Lecture12.1
          Download your PowerBi and Primavera Course Certificate
      • Bonus Course: Progress Measurement System- Downloadable Course
        2
        • Lecture13.1
          Course Download Links
        • Lecture13.2
          Progress Measurement System Certificate
        This content is protected, please login and enroll course to view this content!
        Prev Download and Install Power Bi Free From Microsoft.
        Next Create Your First Interactive Report In 12 Minutes Or Less.

          6 Comments

        1. Avatar
          abo yassen
          December 4, 2019
          Log in to Reply

          THANK YOU ENGINEER HANY

          • Hany Ismail, MSC, PMP
            Hany Ismail, MSC, PMP
            December 9, 2019
            Log in to Reply

            You are Most Welcome.

        2. Avatar
          abhay kulshreshtha
          February 1, 2020
          Log in to Reply

          Hany your teaching ways are way too simple but extently effective although i purchased this lesson almost a year ago but was not getting slot i did in piece meal basis but now i am back and want to finish this course in one go. Thank you again .

        3. Avatar
          [email protected]
          March 6, 2021
          Log in to Reply

          I want to take course how can i get it.

          • Hany Ismail, MSC, PMP
            Hany Ismail, MSC, PMP
            March 8, 2021
            Log in to Reply

            Click on addd to cart, proceed with payment and you will be enrolled to the course once payment is done.

        Leave A Reply Cancel reply

        You must be logged in to post a comment.

        Follow Us:

        About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

        Copyright ©2012- 2020 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

        • Planning Courses
        • Planning Jobs
        • Planning Blog

        Login with your site account

        Lost your password?

        Not a member yet? Register now

        Register a new account

        Are you a member? Login now

        Modal title

        Message modal