• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    Shop

    • Home
    • Uncategorized
    • Data Management and Reporting

    Data Management and Reporting

    $199

    Category: Uncategorized
    • Share:
    • Description

    Data Management is the key success of construction projects reporting. This self-study course will teach you using a step by step case study how to create effective reports using Microsoft Excel by connecting data through Data Management. If you are using Excel to create reports, then this course is a MUST for you. This course is advanced and is very beneficial for planning engineers, construction managers, project managers, and site engineers.

    Download Course Description and Contents: Data Management and Planning Reporting Skills – Course Description and Course Content

    Related products

    • Monitoring and Controlling Excel Sheet
      $25

      Each Planning Engineer, Project Manager,  Construction Manager or  whoever is involved in monitoring and controlling projects must have his Excel Sheet.

      Bringing you from our expertise best practices, and from…

      Add to cart
    • Sale! blank
      5 Planning Tools Package
      $125 $75

      Special excel tools to facilitate the planning and scheduling process for planning engineers. This package includes 5 tools with 40% discount.

      Add to cart
    • blank
      Super Cost and Resource Loading Excel Tool
      $25

      Effective excel tool to create cost and resource loading from the bill of quantities BOQ in few steps. Save your time and efforts with this custom made excel tool….

      Add to cart

    Cart

    0

    Latest Courses

    How to Review a Primavera Time Schedule

    How to Review a Primavera Time Schedule

    $19.00
    Construction Project Planning Intermediate Level with P6 | Excel | PowerBi

    Construction Project Planning Intermediate Level with P6 | Excel | PowerBi

    $350.00
    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00

    From Blog

    blank
    Sample Weekly and Monthly Reports
    20Jun2022
    blank
    How to be prepared to work as a junior planning engineer?
    22May2022
    blank
    Materials Procurement Scheduling in a Baseline Programme
    07May2022
    blank
    Construction Projects Planning Q&A 15-March-2022
    15Mar2022

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....