Back

Claims Management and (EOT)

$175

Learn to prepare, justify and present professional construction claims and Extension of Time (EOT) submissions — with practical delay analysis on a real project.

  • Lifetime access · Certificate with QR verification
  • Course WhatsApp support group

Your account is created automatically at checkout.

-
+
Category:

This course focuses on application, not memorization. You work through a real case study and follow the full claims process: finding the events in the project documents, collecting and recording supporting evidence, analysing the delays, building and defending your case, and preparing a narrative claim report supported by influence schedules in Primavera P6 and the Time Impact (window) analysis technique.

19Lessons
36 hoursDuration
EnglishLanguage
LifetimeAccess
CertificateWith QR verification

What you’ll learn

  • Understand construction claims, delay events and contractual entitlement
  • Find the delay events in project documents and correspondence
  • Collect and record supporting documents, letters and an EOT log
  • Analyse delays and build Primavera P6 influence schedules for each event
  • Apply the Time Impact (window) delay analysis technique
  • Build your case and prepare a professional narrative claim report
  • Defend your case and respond to the client’s comments
  • Understand the contract clauses that govern claims and EOT

Who this course is for

  • Planning engineers
  • Contract administrators
  • Project and construction managers
  • Technical managers

Requirements

  • Working knowledge of Primavera P6 scheduling
  • Recommended: Construction Project Planning (Intermediate Level) with P6 + Excel
  • Primavera P6 to follow the case study

What you get

Lifetime accessWatch every lesson anytime, as many times as you like.
Course filesDownload the lesson files, templates and tools.
WhatsApp support groupAsk questions and get answers from our team in the course group.
Articles libraryPractical articles, files and ready-to-use templates.
Course Q&AAnswers to common student questions, curated by our team.
Certificate of completionVerified with a QR code when you complete the course.

Download the course contents ↓

FAQ

What is the price?
Prices are in US dollars and vary from one country to another. The price shown on this page is the price for your country.
Do I need an account?
No. If you don’t have an account, it is created automatically during checkout.
How do I start after checkout?
You are enrolled automatically. Open the course page and start the first lesson.
Is this course right for me?
Yes, if you deal with delays, EOT or claims on construction projects — as a planner, contract administrator or manager — and want a practical method rather than theory. You should already be comfortable with Primavera P6 scheduling; if not, start with the Intermediate course.
What will I produce in the case study?
An events document, event templates for internal discussion and client clarifications, supporting letters, an EOT log, a Primavera influence schedule with all events plus 11 influence schedules (one per event), and a narrative claim report showing the delays and entitlement.
Are there quizzes?
Yes. Each main lesson is followed by a short quiz to check your understanding before you move on.
Is this course part of a package?
Yes. It is included in the Advanced Planning Package, together with two more professional courses and bonuses.
What is in the Articles Library?
The course includes a library of practical articles, downloadable files and ready-to-use templates on claims, delay analysis and planning topics. Anyone can browse it in the Library tab; enrolled trainees can download every file.
Enroll nowView course curriculum

Your account is created automatically at checkout.

×