-
التخطيط لغير مهندسين التخطيط
1-
Lecture1.1
-
-
البدء فى عالم التخطيط و المتابعه
4-
Lecture2.1
-
Lecture2.2
-
Lecture2.3
-
Lecture2.4
-
-
مهارات الاكسل المطلوبه للتخطيط و المتابعه
5-
Lecture3.1
-
Lecture3.2
-
Lecture3.3
-
Lecture3.4
-
Lecture3.5
-
-
مهارات البريمافيرا المطلوبة للتخطيط و المتابعه
11-
Lecture4.1
-
Lecture4.2
-
Lecture4.3
-
Lecture4.4
-
Lecture4.5
-
Lecture4.6
-
Lecture4.7
-
Lecture4.8
-
Lecture4.9
-
Lecture4.10
-
Lecture4.11
-
-
خطوه بخطوه لعمل برنامج زمنى كامل بالتكلفه وساعات العمل
10-
Lecture5.1
-
Lecture5.2
-
Lecture5.3
-
Lecture5.4
-
Lecture5.5
-
Lecture5.6
-
Lecture5.7
-
Lecture5.8
-
Lecture5.9
-
Lecture5.10
-
-
تقارير خطة العمل
3-
Lecture6.1
-
Lecture6.2
-
Lecture6.3
-
-
تقارير الانجاز و المستخلص الشهرى
3-
Lecture7.1
-
Lecture7.2
-
Lecture7.3
-
-
احصل على شهادك
1-
Lecture8.1
-
This content is protected, please login and enroll course to view this content!
Next
VLOOKUP معادلة
Leave A Reply Cancel reply
You must be logged in to post a comment.
23 Comments
The best start for planning engineer
wonderful introduction into planning concepts ..
Thank you for this course
It’s very good for start planning engineer
The perfect start for any Engineer to be introduced to the planning field by getting to know the planning principles and the needed tools to achieve such a career skills. The course’s videos are consistent enough on each topic that is being discussed in the lesson and gives the chance to be familiar with the profession’s methodology and aspects. Such a pleasant and excellent effort from Eng. Hany Ismael to produce such curriculum base. Thank you very much.
thanks aloooooooooot it is avery good course
important step for the beginner
wonderful introduction into planning concepts ..
i learned alot of things that make me trust of myself and it helps to understand how to be aplanning Engineer
thank you
the course gave me the first step for beginning how to be a planning engineer
very useful course
Thank you so much Engineer Hany for this wonderful start for planning , it was a very good step for engineering planning
Thank you Engineer Hany for this valuable course.
Really it’s very good start a beginner planning engineer.
Thank you engineer Hany the course is excellent and very useful for beginners
amazing content 🙂
thanks alot
Many thanks Eng. Hany , Very helpful course 🙂
Thanks for this and for every thing
Very Helpful Course
amazing content
amazing effort
thanks alot
Very Helpful Course for beginner planning engineer
its amazing!
Simple,Clear and integrated.
i think its the best start for planners Engineer and very important for non planners.
Great Content smooth explanation and very useful as a start for a planning Engineer
Overall Excellent Course…
very good course , great start for Jr planning engineer
It was a fabulous Course with a lot of useful information and a smooth explanation. I really appreciate your efforts.
Thank You, Mr.Hany Ismail.
Excellent course