    Value Engineering

    • Posted by Omar Mukhtar
    • Categories Project Management, Uncategorized
    • Date September 19, 2016
    • Comments 1 comment

    What is Value Engineering?

         Value Engineering “VE” is defined as it is an organized approach to providing the necessary functions

    at the lowest cost, from the beginning the concept of value engineering was seen to be cost validation

    exercise, which did not affect the quality of the product. The straight omission of an enhancement

    or finish would not be considered value engineering.

    This lead to the second definition:

        It is an organized approach to the identification and elimination of unnecessary cost Unnecessary

    cost is Cost which provides neither use, nor life, nor quality, nor appearance, nor customer features.

     

     

     

     

     

     

     

     

    How to increase Value?


     

     

     

     

     

     

     

     

    Value Engineering Phases:


     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    Value Engineering Example Case Study:

    • Information phase:

           A commonly asked question is what chiller is the best, air cooled or water cooled. The answer to that

    question is that there is no one perfect chiller for all applications. There are many aspects that come

    into effect when choosing what chiller would be best for a building and its cooling system. With so

    many decisions being based on cost and purely cost alone, quality is sometimes thrown out of the

    equation. Quality is a major factor of the equation and should always be thought of.

    • Creative phase :

     

     

     

     

     

     

     

     

     

    • Analysis Phase :


     

     

     

     

     

           In the following table “VE Scoring” we will choose few factors which will lead to more accurate analysis where            every factor will be given a weight from 100% to compare between the options we have.


    • Report Phase:

           As Shown in the table in the analysis phase it is recommended to use the water cooled chiller.

     

     

    We hope you enjoy our journey today

    Hope to receive your feedback and recommendations

     

    Tag:project management, Value Engineering

    • Share:
    author avatar
    Omar Mukhtar

    I’m Civil engineer Working in Construction Management field as a Planning Engineer , experience in construction site, studying PRMG diploma at the AUC, made the first step of my professional career before graduation.

    I’m looking forward to increase my experience and knowledge .

    Previous post

    Assigning Activities to WBS
    September 19, 2016

    Next post

    Primavera Tips and Tricks – Activity Steps
    October 8, 2016

    You may also like

    Good Planning VS Poor Planning Pain Curves
    Pain Curve | Good Planning V.S Poor Planning
    15 December, 2021
    2021-10-04_21-42-57
    Productivity Rates for Construction Projects
    4 October, 2021
    img_0142.jpg
    How to perform Cost Control in Construction Projects
    29 September, 2020

      1 Comment

    1. blank
      adishsaleem
      September 21, 2016
      Log in to Reply

      Sir mujae kindly planning enginring ka diploma chahiyae kindly information and contact number

    Leave A Reply Cancel reply

    You must be logged in to post a comment.

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....