Project Management Plan from Planning Engineer Point of View
4-Shop Drawings tracking log:
The Shop Drawings tracking log should be coordinated with the technical department to provide the planning engineer with a list of the forecast shop drawings for all trades, the planning engineer should drive this process by supplying the technical department with the proper form to fill the shop drawing list and then planner fill the planned dates from the schedule and give the form to the document controller to keep updating it.
Tag:activity list, Bill of Quantities, Cash Flow, cost loading, design drawings, detailed time schedule, featured, Manpower Histogram, Materials Tracking Log, planning engineers, Primavera, Project contractual milestones, project management plan, Shop Drawings tracking log, specifications, Work Break Down Structure
Leave A Reply
You must be logged in to post a comment.
10 Comments
this very good
Thanks Engineer Hassan
very good I wish to joining this group to learn more I have basic.
Really this are usefull.
Fantastic template to maintain your project 🙂
good alot
Really this are useful tips.
Thanks Engineer
appreciated your kind efforts