• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    work programme

    • Home
    • work programme
    Showing 1-10 of 392 results
    Hany Ismail, MSC, PMP Hany Ismail, MSC, PMP

    How to read and understand Primavera Scheduling

    • Posted by Hany Ismail, MSC, PMP
    • Categories Planning Using Primavera, Project Management
    • Comments 6 comments
    November 10, 2018
    6

    The Time Schedule or Project Programme is a very important document because it contains the contractual dates (baseline), actual dates (history) and forecast dates (future). The most common software for creating time schedule is oracle primavera However this document is …

    Read More

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00
    blank

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....