• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0
    Have any question?
    (00) 201277767728
    [email protected]
    RegisterLogin
    Planning Engineer Est.
    • Home
    • Blog
    • Courses
    • Tools
    • Jobs
    • Forums
        • Cart

          0
      • Home
      • Line of Balance Excel Tool
      Showing 1-10 of 391 results

      Application of Line of Balance (LOB) in construction projects using Excel

      • Date April 25, 2017
      • Tags construction projects, linar projects, Line of Balance, Line of Balance (LOB), Line of Balance (LOB) method in construction projects, Line of Balance Excel Tool, LOB excel template, planning using line of balance, The application of Line of Balance
      April 25, 2017

      Introduction: I was always asking myself, why line of balance method is not widely used in construction projects? Then I realized that because it is mainly used in the repetitive projects such as roads, pipelines, and other projects with less …

      Read More

      Cart

      0

      Planning Courses

      Cost Control for Construction Projects

      Cost Control for Construction Projects

      $299
      Power Bi Monitoring and Controlling with P6

      Power Bi Monitoring and Controlling with P6

      $299
      Advanced Planning 3 Courses Package

      Advanced Planning 3 Courses Package

      $499
      Data Management and Reporting

      Data Management and Reporting

      $199
      Primavera Online Basic Course -Arabic

      Primavera Online Basic Course -Arabic

      $99
      Professional Planning Engineer (PPE)

      Professional Planning Engineer (PPE)

      $335
      Claims Management and (EOT)

      Claims Management and (EOT)

      $175
      Primavera Online Basic Course -English

      Primavera Online Basic Course -English

      $99
      blank

      Follow Us:

      About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

      Copyright ©2012- 2022 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

      • Planning Courses
      • Planning Jobs
      • Planning Blog

      Login with your site account

      Lost your password?

      Not a member yet? Register now

      Register a new account

      Are you a member? Login now

      Posting....