• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    expert systems

    • Home
    • expert systems
    Showing 1-10 of 392 results
    Hany Ismail, MSC, PMP Hany Ismail, MSC, PMP

    Are project management experts always correct?

    • Posted by Hany Ismail, MSC, PMP
    • Categories Planning Discussions, Project Management
    • Comments 0 comment
    December 23, 2013
    0

    When I was studying in the high school, there was no argument about the source of the information we study, since it was very basic, we assumed it is 100 percent correct and it was kind of black and white. Later on when I joined the faculty of engineering, still we study black and white information with different methods of implementations, the grey area was very limited and this was suitable for BSc level. What I learned so far in my MSc study, there is nothing completely right or wrong; it depends on Expert judgment and how you are going to implement the information and the working environment.

    Read More

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00
    blank

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....