• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    Shop

    • Home
    • Uncategorized
    • 33% Secret Discount – Monitoring and Controlling Using Power Bi Course
    Sale!

    33% Secret Discount – Monitoring and Controlling Using Power Bi Course

    $299 $199

    This is the Secret Offer Page for monitoring and Controlling Using Power Bi Course. You can get this course and save 100.00 USD which equals a 33% discount.

    The offer is expired. Check this link instead: Power Bi Course Link

    The course will be added to your account within 24 hours of your purchase.

    This Offer Also Includes the Bonus Course Progress Measurement System + Eligibility to apply for Planning Jobs

    Out of stock

    Category: Uncategorized
    • Share:
    • Description
    Microsoft Power BI is the future of business intelligence (BI). I have been studying this amazing software by Microsoft for 1 year and I successfully implemented it in the field of planning, scheduling, monitoring, and controlling. I have a similar feeling to my first impression of learning Excel, Do you remember how was your feeling when you created your first formula in Microsoft Excel? Do you remember how you were amazed by the excel capabilities? I promise you that after taking this course you will feel similar or even much better.

    Microsoft Power BI is the future of business intelligence (BI). I have been studying this amazing software by Microsoft for 1 year and I successfully implemented it in the field of planning, scheduling, monitoring, and controlling. I have a similar feeling to my first impression of learning Excel, Do you remember how was your feeling when you created your first formula in Microsoft Excel? Do you remember how you were amazed by the excel capabilities? I promise you that after taking this course you will feel similar or even much better.

     


     

    Microsoft Power BI is very easy software. However, it is magically solved the slow performance of excel for large data, added new amazing interactive reports, and give you too many possibilities to innovate and make creative reports. Therefore, we in Planning Engineer Est. studied this software very well and developed a complete Monitoring and Controlling System using Oracle Primavera, Our Excel Tools, Microsoft Power Bi, and our planning technique.

    The course is around 8 hours of recorded videos, along with practice file which expected to take from you around 22 hours. So if you spent 30 hours in this course you will learn new amazing skills which could add much more power to your reports and enhance your monitoring and controlling skills in just 30 hours.

    This course is suitable for planning engineers, planning managers, project managers, construction managers, and anyone who is involved in monitoring and controlling project progress. You do not need any previous experience in Microsoft Power Bi, this course includes all the required knowledge to convert a primavera schedule into effective interactive reports.

     


    Course Reviews:

    blank

    Related products

    • Sale! blank
      5 Planning Tools Package
      $125 $75

      Special excel tools to facilitate the planning and scheduling process for planning engineers. This package includes 5 tools with 40% discount.

      Add to cart
    • blank
      Productivity Rates PC Software
      $25 – $50

      50 USD for the first installation and 25 USD for the additional update period.

      The First PC software that gathers construction productivity rates, activities description, activities predecessor and successor togethers….

      Select options
    • blank
      Create Primavera Schedule With Relationships Excel Tool
      $25

      New excel tool that allow you to create a complete Primavera schedule along with WBS, duration, and relationships in excel. Even if you do not have any primavera skills…

      Add to cart

    Cart

    0

    Latest Courses

    How to Review a Primavera Time Schedule

    How to Review a Primavera Time Schedule

    $19.00
    Construction Project Planning Intermediate Level with P6 | Excel | PowerBi

    Construction Project Planning Intermediate Level with P6 | Excel | PowerBi

    $350.00
    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00

    From Blog

    blank
    EOT without approved Baseline
    30Jun2022
    blank
    Primavera P6 Excel Import/Export Require Microsoft Access [Solved]
    29Jun2022
    blank
    Variation Orders and EOT
    29Jun2022
    blank
    Sample Weekly and Monthly Reports
    20Jun2022

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....