Introduction about Planning Fast Tracking Course:

Planning Fast Tracking Course is a very special course. It aims to boost your planning and scheduling skills to the maximum with minimum efforts from your side. We will use smart yet simple planning techniques along with 3 projects real case studies to do all the planning tasks for these 3 projects. We will start with planning concepts and general definitions which approximate 100 minutes. Then we will start with case study number 1 where 400 minutes of videos will cover all you need to know to perform all the planning tasks for this case study. After you finish this stage, you will be well educated to perform planning tasks in an easy way. Therefore, our case study project number 2 will be explained in half time of project case study number 1. 200 minutes should be enough to explain this case study for you to be able to perform all the planning tasks. Now you became more expert, so the case study number 3 will be explained in 100 minutes only. It is challenging, but I am sure you will be able to do it.

 

How The Planning Fast Tracking Course will Work:

This special course will be under my full supervision in groups. It means I will start with a group of planning engineers to give them access to course lessons and require from them certain tasks to do. once we completed one stage we will be moving forward to the second stage and so on. Following is the time schedule for the course study:

S.N Lesson Name Proposed Duration (Minutes) Study Schedule
Stage No. 1  
1 Planning Concepts and General Definitions 100  
1.1 Why planning and project management 20 Week 1
1.2 How to plan a project part 1 15
1.3 How to plan a project part 2 15
1.4 Planning Engineer required skills 15
1.5 Planning Terms and Definitions. 15
1.6 Getting Ready for Next Challenges – Install Primavera P6 & Excel 20
Stage No. 2  
2 Case Study 1 – Complete Planning For a Project 400  
2.1 Read the BOQ 10 Week 2
2.2 Develop the activity list on Excel 25
2.3 Link activities to BOQ item 25
2.4 Create Cost loading 25
2.5 Assign Productivity rates 15
2.6 Create Resource Loading 25 Week 3
2.7 Develop activity list on Primavera P6 25
2.8 Load activities with cost and resources 15
2.9 Sequence activities 25
2.10 Adjust the project durations to match contractual requirements 20 Week 4
2.11 Perform resource leveling 15
2.12 First update of the schedule 15
2.13 Weekly Report No.1 25
2.14 Second Update of the schedule 15
2.15 Weekly Report No.2 15
2.16 Third update of the schedule 15 Week 5
2.17 Weekly Report No. 3 15
2.18 Create EOT No. 1 Based on As Planned Method 25
2.19 Create EOT No. 1 Based on Time Impact (Windows Method) 25
2.20 Create Recovery Programme to mitigate contractor delays. 25
Stage No. 3  
3 Case Study 2 – Complete Planning For a Project 200  
3.1 Read the BOQ 5 Week 6
3.2 Develop the activity list on Excel 12
3.3 Link activities to BOQ item 12
3.4 Create Cost loading 11
3.5 Assign Productivity rates 7
3.6 Create Resource Loading 12
3.7 Develop activity list on Primavera P6 12
3.8 Load activities with cost and resources 7
3.9 Sequence activities 12
3.10 Adjust the project durations to match contractual requirements 10
3.11 Perform resource leveling 12 Week 7
3.12 First update of the schedule 12
3.13 Weekly Report No.1 12
3.14 Second Update of the schedule 7
3.15 Weekly Report No.2 7
3.16 Third update of the schedule 7
3.17 Weekly Report No. 3 7
3.18 Create EOT No. 1 Based on As Planned Method 12
3.19 Create EOT No. 1 Based on Time Impact (Windows Method) 12
3.20 Create Recovery Programme to mitigate contractor delays. 12
Stage No. 4  
4 Case Study 3 – Complete Planning For a Project 100  
4.1 Read the BOQ 5 Week 8
4.2 Develop the activity list on Excel 5
4.3 Link activities to BOQ item 5
4.4 Create Cost loading 5
4.5 Assign Productivity rates 4
4.6 Create Resource Loading 6
4.7 Develop activity list on Primavera P6 6
4.8 Load activities with cost and resources 4
4.9 Sequence activities 6
4.10 Adjust the project durations to match contractual requirements 5
4.11 Perform resource leveling 6
4.12 First update of the schedule 6
4.13 Weekly Report No.1 6
4.14 Second Update of the schedule 4
4.15 Weekly Report No.2 4
4.16 Third update of the schedule 4
4.17 Weekly Report No. 3 4
4.18 Create EOT No. 1 Based on As Planned Method 5
4.19 Create EOT No. 1 Based on Time Impact (Windows Method) 5
4.20 Create Recovery Programme to mitigate contractor delays. 5
Total Training Hours 13.3  

 

How to Join?

This is a special course for a special group only. Therefore, it is mandatory to reserve your seat ahead of time. Please fill the form below and we will contact you once there is available seat: