• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0
    Have any question?
    (00) 201277767728
    [email protected]
    RegisterLogin
    Planning Engineer Est.
    • Home
    • Blog
    • Courses
    • Tools
    • Jobs
    • Forums
        • Cart

          0

      Our Team

      • Home
      • Our Team
      • Mahmoud El Refaie
      Mahmoud Refaee

      Mahmoud El Refaie

      Mahmoud El Refaie Omara ,Civil Engineering Informatics Specialist – Planner Engineer ,worked as site and technical office engineer for 4 years ,In planning Engineering my role is filling the gap between the Planning Engineering and Engineering Informatics by developing Smart Engineering Informatics Solutions and Tools, which quick your work and make your tasks more easy without any repetitive or hard work.

      [email protected]

      +002 0122 111 55 49

      Cart

      0

      Planning Courses

      Cost Control for Construction Projects

      Cost Control for Construction Projects

      $299
      Power Bi Monitoring and Controlling with P6

      Power Bi Monitoring and Controlling with P6

      $299
      Advanced Planning 3 Courses Package

      Advanced Planning 3 Courses Package

      $499
      Data Management and Reporting

      Data Management and Reporting

      $199
      Primavera Online Basic Course -Arabic

      Primavera Online Basic Course -Arabic

      $99
      Professional Planning Engineer (PPE)

      Professional Planning Engineer (PPE)

      $335
      Claims Management and (EOT)

      Claims Management and (EOT)

      $175
      Primavera Online Basic Course -English

      Primavera Online Basic Course -English

      $99

      Follow Us:

      About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

      Copyright ©2012- 2022 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

      • Planning Courses
      • Planning Jobs
      • Planning Blog

      Login with your site account

      Lost your password?

      Not a member yet? Register now

      Register a new account

      Are you a member? Login now

      Posting....