• Home
  • Forums
  • Blog
  • Courses
  • Tools
  • Jobs
    Have any question?
    (00) 201277767728
    [email protected]
    RegisterLogin
    Planning Engineer Est.
    • Home
    • Forums
    • Blog
    • Courses
    • Tools
    • Jobs

      Our Team

      • Home
      • Our Team
      • Hany Ismael
      Hany Ismael Photo

      Hany Ismael

      Hany Ismael MSc, PMP is a Civil Engineering post graduate from the Liverpool University, Certified Project Management Professional PMP, involved in various multi level construction projects since 14 years, and currently working as General Manager of Planning Engineer Est. Hany worked as a Planning Manager in Saudi Arabia for the past 10 years. He was involved Mega construction projects with multinational organisations.

      Other Members

      10945043_10155174835250721_4157408758524732866_o

      Omar Mukhtar

      Cart

      0

      Featured Courses:

      Cost Control for Construction Projects

      Cost Control for Construction Projects

      Because Construction Projects are complicated by their natural, companies are very interested not to lose control. Therefore, for time monitoring, there is a time schedule,...
      Power Bi Monitoring and Controlling with P6

      Power Bi Monitoring and Controlling with P6

      Microsoft Power BI is the future of business intelligence (BI). I have been studying this amazing software by Microsoft for 1 year and I successfully implemented...
      Advanced Planning 3 Courses Package

      Advanced Planning 3 Courses Package

      This advanced planning Package contains all the required knowledge to boost your career from junior planning engineer, site engineer with little planning and scheduling skills,...
      Data Management and Reporting

      Data Management and Reporting

      Data Management is the key success of construction projects reporting. This self-study course will teach you using a step by step case study how to...
      Primavera Online Basic Course -Arabic

      Primavera Online Basic Course -Arabic

      كورس التخطيط والمتابعة لغير مهندسين التخطيط كورس عملى مفصل لجميع خطوات التخطيط والمتابعة فى المشروعات الإنشائية باستخدام البريمافيرا و الاكسل مع مثال عملى لإنشاء برنامج زمنى متكامل...
      Professional Planning Engineer (PPE)

      Professional Planning Engineer (PPE)

      Professional Planning Engineer - advanced p6 course Download Professional Planning Engineer Course Description and Contents: PPE - Course Description and Course Content Online planning and scheduling...
      Planning Courses

      Follow Us:

      About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

      Copyright ©2012- 2020 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

      • Planning Courses
      • Planning Jobs
      • Planning Blog

      Login with your site account

      Lost your password?

      Not a member yet? Register now

      Register a new account

      Are you a member? Login now