
– Procurement Planning Engineer is require

Zamil Industrial
about the company:
Innovative Design & Engineering Solutions
Founded in 1998 and headquartered in Dammam, Saudi Arabia, Zamil Industrial Investment Company (Zamil Industrial) is a premier business group engaged in the development of innovative design and engineering solutions for use in the construction industry.
Also a leading manufacturer and fabricator of construction materials, Zamil Industrial implements its engineering excellence through a wide range of products and services, including pre-engineered steel buildings, steel structures, air conditioning and climate control systems designed for a wide range of commercial, industrial, and residential applications, telecom and transmission towers, process equipment, precast concrete building products, fiberglass and rock wool insulations, pre-insulated pipes, maintenance and repair of HVAC equipment, maintenance and inspection of industrial projects, building automation systems, security and protection systems, turnkey project solutions, and solar power projects. The company also offers award-winning installation and erection services.
Through its various industrial sectors, Zamil Industrial provides a broad range of products and solutions that meet the increasing needs and requirements of the global building and construction industry.
Zamil Industrial products are marketed and sold in more than 90 countries around the globe, and the company operates manufacturing facilities in Saudi Arabia, United Arab Emirates, Egypt, India, and Vietnam.
Our companies manufacture and fabricate materials and provide innovative engineering systems, customized solutions and services to clients for use in construction and industrial operations.
Zamil Industrial employs about 9,000 people worldwide and derives about 25% of its revenues from outside Saudi Arabia.
Zamil Industrial shares are actively traded on the Saudi Stock Exchange (Tadawul).