
planning engineer is require

FIREFREEZE
Looking for “ Engineers” Fresh Graduate for ongoing projects for fire alarm system and fire protection system for following departments.
1. Planning Engineer about the company:
About Us
We at “FIREFREEZE” are involved in installation and maintenance of all type of fire alarm systems and fire protection systems. We have full expertise on engineering ,design, supply, installation and testing commissioning of fire protection systems on turnkey basis. We represent all major manufacturer and suppliers of industries having UL listed and FM approved products.
We are approved and registered vendor and contractor for Saudi Aramco, Sabic Groups, Saudi Electric Company (SEC), Saudi Telecom company (STC), Ministry of Health (MOH), Ministry of Interior ( MOI), Saline Water Conversion Corporation (SWCC) , EPCC and local civil defence authorities.
Our professional Engineers are in this field since last twelve years. We have designed and executed various type of fire protection system right from base design to commissioning. The numerous projects executed by our team in Government, Semi-Government, Power Plants, Sub Stations, Commercial and Residential Buildings throughout Kingdom Of Saudi Arabia. We can provide our full details profile which contains total list of projects executed by our team.
We are specialized in designing, supply, installation, testing, and commissioning of various fire protection and fire alarm systems like
Clean Agent (FM-200) Fire Protection System
NOVEC 1230 Clean Agent Fire Protection System
CO2 Fire Protection System
Water Sprinkler System
Deluge Water Spray System
Foam Spray System
Dry Chemical System
Fire Hose Reel Cabinet / Fire Hydrant System
Fire Fighting pump system / Pressure Tank System
Conventional Fire Alarm System / Addressable Fire Alarm System
Room Integrity Test
Gas Monitoring Systems
General Mechanical / Electrical works.
Spare Parts For Pumps / All Type Valves / Spare For Electrical and Mechanical Systems.
Our team is also capable of taking maintenance of fire protection system and fire alarm system. We can offer the services of our Engineers and technician for emergency requirements. Further we can also take annual and half yearly maintenance contracts to ensure smooth functioning of various fire fighting system and fire alarm system throughout the year.
We are member of National Fire Protection Association, USA which gives us access to be in touch with latest standards, technologies, and new rules and regulation.
Briefly we have presented our capabilities and we would like to work with you on your on going and next upcoming projects. We provide our best & professional services on small work as well as on big works in Any region of Saudi arabia.
Please give us a call to work with you on your projects to provide best professional services on very competetive pricing.