• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    planning engineer is require

    • Home
    • planning engineer is require

    planning engineer is require

    • Posted by PlanningJobs
    • Date June 15, 2022
    • Full Time
    • Saudi Arabia
    • Posted 2 weeks ago
    ALKHORAYEF GROUP

    ALKHORAYEF GROUP

    Positions required for Water Pipeline and Pumping stations in Dammam                                                                 planning engineer                                                                                                                                                                 ABOUT THE COMPANY:

    Alkhorayef Group was founded in 1957 by the late Abdullah Ibrahim Alkhorayef, who was quite ambitious and daring. By virtue of his dedication, the group made its name in Saudi Arabia’s agriculture sector.  He soon represented reputable international producers of water pumps, agricultural, irrigation and well drilling equipment in the Kingdom.

    In a short span of time, Alkhorayef Group has achieved excellence on agricultural market by representing and marketing the top of the line brands, combined with a variety of excellent services to its customers.

    The Company diversified its activities and continued its progress in various fields such as machinery systems, oil, contracting as well as printing and paper. As it became necessary to pay particular and specialized attention to each field, the founding Company branched into several subsidiaries, each being independent in terms of management and resources, but all are unified under the established corporate code of ethics of the Alkhorayef Group.

    Today the Group which enjoys a worldwide presence ,operates in more than 40 countries representing renowned quality products and manufacturers.

    Before applying for this position you need to submit your online resume. Click the button below to continue.

    • Share:
    author avatar
    PlanningJobs

    Planning Engineer Est. sharing planning jobs for Junior Planning, Senior Planning, and Planning Managers in Middle East, Gulf countries, India, Pakistan.

    If you have a Job and want to post free, send the job details to [email protected] or post it yourself using this link: https://planningengineer.net/post-a-job/

    Previous post

    planning engineer is require
    June 15, 2022

    Next post

    planning engineer is require
    June 25, 2022

    You may also like

    2022-06-19_11-56-47
    Sample Weekly and Monthly Reports
    20 June, 2022
    How to become a planning engineer
    How to be prepared to work as a junior planning engineer?
    22 May, 2022
    Materials Procurement Scheduling in a Baseline Programme
    Materials Procurement Scheduling in a Baseline Programme
    7 May, 2022

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....