
Junior Planning Engineer

DWC
Position
Junior Planning Engineer (1 position open)
Location
Kuwait
Responsibilities
Essential Duties and Responsibilities include the following:
(The candidate will work under a manager and will receive instruction. Gradually, the degree of responsibility will be increased as the candidate becomes more familiar with the contracting environment.)
- Prepares schedules
- Prepares progress reports
- Prepares invoices
- Prepares Scope of Work
- Reviews drawings and submittals
- Reviews Contracts
Qualifications (Mandatory)
- Engineering Degree (Civil, Electrical, Mechanical)
- Minimum 2 years actual construction experience as Site Engineer or equivalent
- Excellent proficiency in English
- Primavera P6
Requirements (Mandatory)
- Resident of Kuwait or under Article 18 Visa
- Must be able to start within 3 months (if currently employed in Kuwait to complete notice period)
- If hired and current company requires the full notice period, flexibility may be given provided that the candidate shows willingness to familiarize himself with the company environment and work load.
- Must be able to work with a multi-cultural environment or with different nationalities
Essential qualifications
- Able to operate AutoCAD
- Familiar with RMS
- Holds a valid driving license and/or with own car (fuel allowance provided)
Others
- Any nationality is welcome to apply provided the requirement of residence is satisfied
- No limit on age as long as it does not interfere with the requirements of the job
- Any gender is welcome to apply. However, this job requires visiting construction sites, which may also require climbing, early work times, late work times, or other special circumstances. Please reconsider if your flexibility is limited.
- Paid vacation leave is 30 days per year. However, vacation days or a portion thereof, will only be made available after 9 continuous months of employment. Employees may apply for vacation at any time of the year depending on the accumulated leave days. Leave may also be granted for special circumstances. Work may be performed during leave or vacation.
- No preference for language ability except English
- Send CV with cover letter to [email protected]