    Week 6-defend your case-071216

    Home › forums › Week 6-defend your case-071216

    • This topic has 4 replies, 4 voices, and was last updated 5 years, 5 months ago by James Anabo.
    Viewing 4 reply threads
    • Author
      Posts
      • January 11, 2017 at 12:37 pm #23787
        Hany Ismail, MSC, PMPHany Ismail, MSC, PMP
        Keymaster

        Lesson:

        [s3video s3url=”claims/wk6.mp4″ /]


        Attachments:

        Please download this lesson presentation from this link: week-6

        Please download final EOT log from this link: final-eot-log-r1

        Please download the narrative report from this link: narrative-report-r1

        Please download the Mail Merge Tool and guide from this link: mail-merge

        Please download the Influence Shedules from this link: influence-shedules-r1


        Assignment:

        Please try to make the narrative report as explained and see how many delays your project was delayed.


        Lesson 7 -Time Impact window delay analysis Technique

        [s3video s3url=”claims/l7.mp4″ /]

         

        Attachments:

        Please download this lesson presentation from this link: time-impact-technique


        Lesson 8 – Contracts Module:

        [s3video s3url=”claims/contract.mp4″ /]

        Attachments:

        Please download this lesson presentation from this link:

        fidic_suite_of_contracts_0

        part-1-introduction-to-contracts

        part-2-fidic-what-you-need-to-know-about-it

        part-3-claims-disputes-and-arbitration-under-fidic


        Continuous Improvement – Join our claims community

        See how our Forums works:

        [embed]https://www.youtube.com/watch?v=upcDQ57AwRY[/embed]


         

        Access our Support Forums: http://planningengineer.net/forums/forum/claims-management-and-delays-analysis-support-forums/


        Your Feedback:

        Please send us your recommendations and suggestions to [email protected]

        Furthermore, we appreciate your time to rate our course as explained in the video below:

        [embed]https://youtu.be/gr6D1uVxlO4[/embed]

        You can use this link to rate this course now: Rate Us

        Note: By End of this week, the certificate link will be posted so you can print your completion certificate.

      • January 12, 2017 at 10:33 am #23802
        blankGert Truyens
        Participant

        Hi Hany and others,

        I’ve noticed that the XER files are 13MB large, due to the so-called ‘POBS table’. This contains useless information and is probably introduced by Oracle for some dubious reasons… You can manually delete the table, or use a tool called Purge POBS which I’ve attached. This reduces the 13MB to only 200KB.

        The files remain fully operational and don’t loose any information.

        (ps. the latest versions of P6 don’t create these tables anymore)

        Hope this helps,

        Best Regards,

        Gert Truyens

      • January 14, 2017 at 2:44 pm #23813
        blankGert Truyens
        Participant

        Hi All,

        Please find attached my assignment. This one was easy!

        Best Regards,

        Gert

        Attachments:
        You must be logged in to view attached files.
      • January 17, 2017 at 5:41 am #23834
        blankAbdul Jalil
        Participant

        Dear Sir/ All,

        good Morning,

        please find the attached my assignments for week# 6

        regards

        Attachments:
        You must be logged in to view attached files.
      • January 22, 2017 at 7:23 am #23911
        blankJames Anabo
        Participant

        Hi Mr. Hany,

        The mailmerge app only works for 32-bit system. I have a 64-bit system.

        Could you provide for 64-bit system?

        Thank you

    • Author
      Posts
    Viewing 4 reply threads

    You must be logged in to reply to this topic. Login here

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....