    ORIGINAL DURATIONS

    Home › forums › Oracle Primavera Questions and Answers › ORIGINAL DURATIONS

    • This topic has 3 replies, 3 voices, and was last updated 4 years, 11 months ago by Hany Ismail, MSC, PMPHany Ismail, MSC, PMP.
    Viewing 2 reply threads
    • Author
      Posts
      • June 19, 2017 at 7:11 am #27448
        blankismail Ajimir
        Participant

        explain me what is the reason that, in some schedules the total original duration for the project is not reflecting the same number of days by the the differance between start and finish dates.

        total duration should be = (start – finish)+1 , but showing less number of days

      • June 19, 2017 at 10:06 am #27457
        blankMahmoud El Refaie
        Participant

        Dear Ismail,

        This problem may arise because you assigned different calendar working hours to project than the scheduling working hours for the primavera software.

        For Example : Activity A has 4 days with calendar 10 days —–> this equal 40 hours for the activity

        although the default for the primavera from the admin reference says that the day contains 8 hours

        so in the start and finish date you will see that the activity

        Start : Day(1)

        Finish : Day(5)

        Duration : 5 days , instead of (4) days

        you can change this form the admin preference as shown in the attached photo , and this will match the dates with the original duration.

        I hope the answer is clear for you and if you have any comments or more clarification , please don’t hesitate to reply.

        Thank you ,

        Regards,

        Mahmour Omara

         

        Attachments:
        You must be logged in to view attached files.
      • June 21, 2017 at 7:42 am #27507
        blankismail Ajimir
        Participant

        thanks for your comments, but still i have the issue, say for an example if we have more than one type of calender how we can change the settings in this admin preferance

        • July 5, 2017 at 5:02 pm #27783
          Hany Ismail, MSC, PMPHany Ismail, MSC, PMP
          Keymaster

          I have one trick for you. Just change the default calendar in your project to 7 working days and you should have same duration(start – finish)+1

          Check this out and tell me if it works 😉

    • Author
      Posts
    Viewing 2 reply threads

    You must be logged in to reply to this topic. Login here

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....