• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    Reply To: Moved: Week 2 Assignment Answer

    Home › forums › Claims Management and Delays Analysis-Support Forums › LESSON 2 SUPPORT- FIND THE EVENTS. › my report to the project manager. › Reply To: Moved: Week 2 Assignment Answer

    October 10, 2016 at 11:53 am #22470
    hussam hussein
    Participant

    Dear Mahmoud,
    Your comments are highly valuable to me. Kindly notice that it is not enough to look at the each event separately, you have to build your argument in claims based on the approved construction schedule.
    1- Block work; is on the critical bath, which meas you can’t use the delivered materials until consultant approve. Any delay will push the date.
    2- For some other items you mentioned, there is float for those activities and usually (depending on contract) float is owned by owner and it will be a consultant argument that he is consuming HIS FLOAT.
    3- Many projects can be tested and commissioned by using Generators and even starting the operation which will not in my opinion will cause any claim for EOT.

    Thank you for your time reading my answer and comments on it. Waiting for more comments on coming weeks.

    Regards,

    Hussam

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....