    Reply To: Moved: Reply To: WEEK 2- FIND THE EVENTS-28816

    Home › forums › Claims Management and Delays Analysis-Support Forums › LESSON 2 SUPPORT- FIND THE EVENTS. › Please find attached a copy of my lesson 2 assignment. Looking forward to the contributions. › Reply To: Moved: Reply To: WEEK 2- FIND THE EVENTS-28816

    October 11, 2016 at 1:07 am #22486
    Stephen Emenike
    Participant

    Mahmoud,

    I do appreciate your contribution to our learning experience. I have reviewed your feedback concerning my report. I do agree with you in some areas and also disagreed with in other areas which I have narrated below:

     

    1- Yes we are saying the same thing; my report has the “Material Submit Form Lighting Fixture” indicated as a “clear event”

    2- I did not include any non-event in my report; no need wasting the project manager’s time with non issues

    3- “18- I agree as per original schedule, the contractor would have completed procurement of all paint material including ETA (Expected Time of Arrival) on site on 20-Oct-12 as you indicated, but this SWI dated 15-Mar-13 was issued at the final stage of construction – Structure Finishing (Painting Final) 18-Mar-13 To 03-Apr-13. I do not however, believe this to be a clear event but a Hidden event. This is because the contractor was instructed per this SWI to change the Final Painting Color only 3 days to its scheduled start. Considering that this activity has only 2 days float,”we may need to file an EOT claim due to time required to complete a new and separate procurement for the current specified paint color as the lead-time will likely eat up the 2 days float, and impact the critical path.

    I hope my counter-explanation helps add some value to our learning experience on this important topic. Please feel free to let me know if you still feel otherwise.

    Thanks.

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....