    Reply To: Moved: Reply To: WEEK 2- FIND THE EVENTS-28816

    Home › forums › Claims Management and Delays Analysis-Support Forums › LESSON 2 SUPPORT- FIND THE EVENTS. › Please find attached a copy of my lesson 2 assignment. Looking forward to the contributions. › Reply To: Moved: Reply To: WEEK 2- FIND THE EVENTS-28816

    October 10, 2016 at 9:29 am #22467
    Mahmoud El Refaie
    Participant

    dear Settr,

    Really it is professional work and good justification for every event .

    I am agree with your justification in your sheet but i have some comments about the following

    1- ” 6- Material Submit Form Lighting Fixture ” : I think it is clear event because “Consultant reply planned to be maximum on 15-Apr-12 ,but actually the reply sent on 12-May-12  with a lot of delay

    2- “16- Site Work Instruction Start date for T.V System and P.A System ” : I think it is not event because ” Activity has a total float 78 days which is more than the delay period”.

    3- “18- Site Work Instruction Change Painting Color Code ” : I think it is clear event because ” SWI after related material delivering to site Date 20-Oct-12 according to the time schedule”.

     

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....