• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    Reply To: Moved: Reply To: WEEK 2- FIND THE EVENTS- 071216

    Home › forums › Claims Management and Delays Analysis-Support Forums › LESSON 2 SUPPORT- FIND THE EVENTS. › Please find attached my report for week 2 and feel free to comment if you find any shortcomings in my understanding › Reply To: Moved: Reply To: WEEK 2- FIND THE EVENTS- 071216

    December 17, 2016 at 7:52 am #23402
    Omar Mukhtar
    Participant

    Dear Fahad,

    If you please allow me to comment on your submitted assignment:

    1. Material Submittal No.3 (MAR-04), If we checked at the response date “12 May 2012” we will find 27 days delay which will delay the whole process of procurement and executing of these fixtures, so it will be a “Hidden Event” caused by the consultant.
    2. Minutes of Meetings No.3, this is a claims for sure but it is considered as a direct cost claims not an Extension of Time claims if there is no clause in the project conditions documents refers that the contractor is entitled for an EOT if the payments are delayed.
    3. Shopdrawing No.3, this event will be considered as a direct event, as If we linked between the
      procurement scheduled date and the response date we will know that the whole process needs to start from beginning due to the change of the type which will give the contractor the right to ask for EOT.
    4. Site Work Instruction No.1, This activity will not affect the time schedule as it already has Total Float = 78
      days and the holding period is only 30 days, therefore this will not be an event.

    Kindly notify me if you have any comment.

    Best Regards.

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....