• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]lanningengineer.net
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    Reply To: Moved: Lecture 4 Assignment

    Home › forums › Claims Management and Delays Analysis-Support Forums › LESSON 4 SUPPORT- ANALYSE THE DELAYS. › Lecture 4 Assignment › Reply To: Moved: Lecture 4 Assignment

    October 22, 2016 at 11:56 am #22657
    Muhammad Yamin
    Participant

    Dear Mr. Omar Mukhtar

    It’s really nice to see your assignments, I am following your assignments as well. My question is, during our EOT claim we prepared the same kind of excel sheet & we put hyperlinks to the letter, analysis etc mentioned in this kinda excel sheet. But those links were only working at our networks not any other compluter systems.

    Is there any method that we can put these hyperlinks/links that are workable to all computer systems? It would be really nice if we could have this kind of option in our log file.

     

    Regards

    Yamin

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....