• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    Reply To: Lesson 6.3 Receive your first update data

    Home › forums › Professional Planning Engineer PPE-Support Forums › Wk6- Controlling the project › Lesson 6.3 Receive your first update data › Reply To: Lesson 6.3 Receive your first update data

    June 18, 2017 at 12:12 pm #27433
    Hany Ismail, MSC, PMPHany Ismail, MSC, PMP
    Keymaster

    I agree with you that the cumulative update could reach a stage that it cannot be managed by excel. In that case, you can copy the update from the pivot table (which cummulate the data from different week), and past it instead of all the weeks data. This will reduce the volume of the data and you can repeat this step whenever required.

    Regarding getting the update from the site team, it depends on the project natural and construction team background. In some projects i used to receive the updates in PDF file, other projects updates were in excel. At the end of the day, we are just telling you what we believe it is the best solution, you can modify, add, and omit to develop your own system to best fit your project.

    I hope my reply answered your questions. If you have any further questions, please feel free to ask, but be specific.

    Best Regards,

    Hany Ismael

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....