    Reply To: Lesson 5.1 Finalize the project schedule in P6 and Perform resource leveling

    Home › forums › Professional Planning Engineer PPE-Support Forums › WK5- Monitor the project progress, project resources, and productivity › Lesson 5.1 Finalize the project schedule in P6 and Perform resource leveling › Reply To: Lesson 5.1 Finalize the project schedule in P6 and Perform resource leveling

    June 12, 2017 at 12:42 pm #27227
    Mahmoud El Refaie
    Participant

    Dear Karman ,

    Kindly find the following answers for your questions :

    1- No need for making resource leveling with each update , but you can check with every update the main key resources and if it needs making resource leveling or not.

    2- After making resource leveling  you may need to re-baseline , if you make changes with activity start dates and change sequence of work.

     

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....