• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    Reply To: Lesson 3.2 – Develop project Productivity bank

    Home › forums › Professional Planning Engineer PPE-Support Forums › Wk3- Planning in Excel. › Lesson 3.2 – Develop project Productivity bank › Reply To: Lesson 3.2 – Develop project Productivity bank

    May 23, 2017 at 9:48 am #26849
    Mahmoud El Refaie
    Participant

    Dear Eng.Mohamed,

    First of all , Sorry for our late reply , it was because of technical issue and really we didn’t see your comment

    about your question , off course you can add the equipment and tolls to your activity with its productivity rates and calculate also the activity duration if the activity mainly depends on equipment

    we tried to give the concept and focus on labor in the workshop , but actually you can add any resource with the same concept even it is equipment or tool

     

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....